InnerWeb
Skip to main content

Contractor qualification profile at a wood plant: a guide

Before an employee of an external company is assigned to a permit at a wood plant, someone must check that they hold valid authorisations, medical examinations and training. This guide shows how to build a contractor qualification profile so that the system carries out this check and the coordinator assesses the exceptions.

What a qualification profile is

A qualification profile is a set of requirements that a person must meet in order to carry out a given type of work at the plant. The system stores the qualifications, medical examinations and training results of employees, and when a permit is created it checks whether the assigned people hold the required, valid authorisations.

At a wood and furniture plant the profile differs for an electrician, a welder, a dust extraction service technician and a forklift operator. What all of them share is that each requirement has an expiry date, and once it is exceeded the person no longer qualifies.

Which qualifications and medical examinations are usually checked for work at a wood plant

The list below is a recommendation. The specific requirements depend on the regulations, the plant's instructions and the type of work, so the plant should confirm them with the person responsible for occupational health and safety.

  • Current medical examinations suitable for the position and the work environment.
  • Initial training for the plant, including the fire and explosion rules related to wood dust.
  • Authorisations for hot work if the job involves fire, cutting or welding.
  • Qualifications for work on electrical equipment.
  • Training for work in explosion hazard zones if the work takes place in zone 22.
  • Authorisations for vehicles if the contractor moves around the hall by vehicle.

Number of requirements in a sample contractor profile

Number of requirements in a sample contractor profileHorizontal bar chart: a visit without work 2 requirements, dust extraction service 4, hot work in zone 22 6 requirements.0246requirementsVisit without workVisit without work: 2 requirements2Dust extraction serviceDust extraction service: 4 requirements4Hot work in zone 22Hot work in zone 22: 6 requirements6
Source: Sample number of requirements taken from the list in the section on which qualifications and medical examinations are checked

How the system monitors validity

The check takes place at the moment the permit is created: the system compares the requirements of the type of work with the qualifications of the people whom the orderer adds. A person without a valid authorisation is not assigned, and the orderer sees the reason.

The permit flow for work ordered from an external company runs on a single permit: the person ordering the work on the plant side and the contractor see the same data. The contractor therefore sees who is missing and can complete the documents before the orderer comes back to the matter.

Visits and qualifications

A planned visit by an external company replaces the permit for one day for people who do not carry out work, for example during a discussion, a quote or measurements. It does not replace the requirements: training, qualifications and an active account still decide whether a person may enter.

For the coordinator this means a simple rule: the qualification profile also applies during a visit, but the scope of requirements for a person who only quotes is smaller than for a person who welds.

Evidence for an audit

For an auditor what counts is the answer to the question of who admitted a given person and on what basis. The system records which qualifications the person met at the moment of assignment to the permit, so the evidence does not require reconstructing files after the fact.

The printout of the permit is produced from current data, in the language of the employee, with pictograms of the risks and protective measures. The external company's employee therefore receives a document they understand, and the coordinator has a trace that the requirements were checked.

Video

Frequently asked questions

When does the system check qualifications?

When the permit is created and the coordinator assigns employees. A person without the required valid authorisations is not assigned.

Does a visit exempt someone from qualifications?

No. A visit replaces the permit for one day, but training, qualifications and an active account still decide whether a person may enter.

Who sets the list of requirements?

The plant, based on the regulations and its own instructions. The list presented in the guide is a recommendation to be confirmed by the person responsible for occupational health and safety.

Let us build a qualification profile for your plant

We will show on a demo how the system checks the validity of a contractor's authorisations when a permit is created.

Let's talk