Note 1: the yard is covered along roads, not across the surface
The recommended density is about every 100 m along plant roads and 1 transmitter per 100-200 m² in a building. On a storage yard the starting point is placement along the roads and passages used by people and vehicles, not an even grid over the whole surface.
In a network of 600 radio beacons on the road routes of a large chemical plant, the spacing was matched to the roads and mounting was priced per unit including installation. The same way of thinking applies to the yard: first the routes, then the parking and loading places.
Note 2: no GPS, but not without a plan
Location works without GPS, and the position results from the signals of several transmitters averaged on the map, not from the strongest transmitter. On a yard this means that at every point where a position is needed, the phone must receive several transmitters at the same time.
Tall material stacks create signal shadows, and the stacks move. Place the transmitters in fixed locations: on poles, gates, canopies and fences, and avoid mounting on elements that change position together with a stack.
Transmitters on the roads of a sample yard (100 m spacing)
Note 3: data coverage and alarms
The effectiveness of location depends on transmitter coverage. Alarm and SOS do not work outside network coverage without a separate coverage solution. A yard on the outskirts of the plant may have weak cellular coverage, so coverage must be checked before purchase.
Field work without Wi-Fi is possible to a limited extent: actions that change data are queued locally in the device's browser and replayed when the network returns, without duplicates. This does not replace coverage for alarms, which must arrive immediately.
Note 4: sample calculation for a 400 by 200 m yard
Assume a yard of 400 m by 200 m with 2 longitudinal roads of 400 m each and 3 transverse roads of 200 m each. Together this is 1,400 m of roads, and at a 100 m spacing about 14 transmitters: 8 on the longitudinal roads and 6 on the transverse ones. Junctions give shared places, so the real number may be slightly lower.
This is only a starting point for the quotation. After the test walk, transmitters are added where tall stacks attenuate the signal, and at the gates. For larger yards the number grows linearly with the length of the roads, not with the area.
Note 5: expansion and changes to the yard layout
The yard changes: new stacks, new roads, relocated storage places. Plan in the contract for adding transmitters without rebuilding the whole network, and for updating the map after every change to the layout.
After a change, use a test walk to check the areas where new obstacles have appeared. A change of mobile devices does not require rebuilding the transmitter network, so expansion concerns only the infrastructure on the yard.
Note 6: acceptance and documentation
Acceptance of the yard covers a walk along all roads, checking the position at the gates and at the junctions, and a test of the alarm at the furthest point of coverage. The result is recorded in a protocol with the plan.
For the logistics department, a list of places where position accuracy is reduced because of stacks is also useful. Knowledge of these limitations avoids questions about why an employee's position between two stacks is sometimes less accurate.
Transmitters on a 400 by 200 m yard
| Parameter | Value |
|---|---|
| Longitudinal roads | 2 x 400 m |
| Transverse roads | 3 x 200 m |
| Spacing | 100 m |
Result: 1,400 m of roads, about 14 transmitters
Note: Sample calculation based on the assumptions in the page text; not an offer, individual quotation applies.
Video
Frequently asked questions
Can a storage yard be covered with location without GPS?
Yes. The position results from the signals of several transmitters averaged on the map, so GPS is not needed. The condition is coverage with transmitters at the points where position matters.
What spacing should be used on a yard?
About every 100 m along plant roads as a starting point; after the test walk, transmitters are added where stacks attenuate the signal.
Does the alarm work on a yard without network coverage?
Alarm and SOS do not work outside network coverage without a separate coverage solution, so coverage is checked before purchase.
Let us calculate the coverage of your yard
Based on the road plan we will prepare a preliminary spacing and a list of places where coverage needs to be checked.
Let's talk