Three-stage pilot: one week remote, 2 days of installation, 8 weeks of operation

The maintenance manager of a chemical plant wants to test a patrol system without stopping the installation and without a long project. We describe a pilot model in three stages: about a week of remote preparation, 2 days of installation on site and 4-8 weeks of operational work. Below is a scenario based on this model, with decisions at each stage.

2 days
installing 100 beacons across 8 floors
Source: pilot offer card
4-8 wks
operational work in the pilot
Source: pilot offer card
12
modules available in the pilot
Source: pilot offer card

Starting point: patrols on paper and the need for proof

The chemical plant runs installation patrols based on paper cards. The maintenance manager knows there is no proof that a patrol really covered all points, and does not want to run a long IT project just to check it. They need a pilot that gives an answer in weeks, not quarters.

The sequence presented here is the patrol pilot model used in InnerWeb offers, written up as a scenario for a chemical plant. The time figures come from the pilot model, not from a report on one specific plant.

Stage 1: remote preparation, about one week

The first stage lasts about one week and takes place without a visit to the plant. During this time the instance, user accounts and the mapping of the patrol route onto the plant plan are prepared. The plant provides the installation plan, the list of points and the list of people who will carry out the patrols.

For the maintenance manager what matters is that this stage does not burden production. It requires one conversation about the route, delivery of the plan and naming a coordinator. In this time the IT department receives the architecture document and can ask questions before anyone installs the first beacon.

  • plan of the installation or hall with the patrol points marked
  • list of people carrying out the patrols and their roles
  • agreement on which points are mandatory and which are optional
  • contact to a person in IT and a person in OHS on the plant side

Duration of pilot stages (upper values)

Duration of pilot stages (upper values)Bar chart: stage 1 lasts 7 days, stage 2 lasts 2 days, stage 3 lasts from 28 to 56 days.0204060daysStage 1 remote: 7 days7 daysStage 1 remoteStage 2 installation: 2 days2 daysStage 2 installationStage 3 work (min.): 28 days28 daysStage 3 work (min.)Stage 3 work (max.): 56 days56 daysStage 3 work (max.)
Source: Patrol pilot model: 1 week, 2 days, 4-8 weeks (converted to days)

Stage 2: two days on site, without shutting down the installation

The second stage is 2 days of installation. In the pilot model, 100 beacons across 8 floors are mounted in 2 days without connection to a power supply, because the beacons are battery-powered, so the installation does not have to be shut down. For a chemical plant this is the key information: the installation does not require a turnaround window or electrical work on the installation.

If the installation covers explosion-hazard zones, the choice of beacon and its location is agreed with the person responsible for explosion protection. InnerWeb has an industrial beacon with ATEX design for zones 2/22, so in zones of this class the conversation concerns specific locations, not whether the device can be used at all.

Stage 3: 4-8 weeks of operational work

The third stage is operational work for 4-8 weeks. The same people carry out the patrols, at the same hours, but with a phone or device that confirms passage through the points. The maintenance manager compares the results with the paper records and checks how many points were skipped and at what times.

In the strategic cooperation model with an industrial plant, after the conversation a pilot lasting 3 to 6 months follows, and then full implementation. The three-stage patrol pilot is a shorter form of the same idea: quick proof on one route, followed by a decision on scale.

What the maintenance manager sees in the data after a few weeks

After 4-8 weeks the pilot gives the maintenance manager three kinds of evidence: completeness of the patrols, time to walk the route and events that deviate from the norm. We do not give a number of saved hours here, because it depends on the plant and the route, and the result must come from measurement in that plant.

For the plant it also matters that the pilot exposes questions nobody asked before: whether the route can realistically be walked within an hour, whether the points are placed sensibly, whether the shifts follow the same rhythm. The answers do not depend on the technology, but without data they cannot be obtained.

Twelve modules on the same instance

The pilot has 12 modules available on the same instance, and enabling more of them does not require extra hardware or reinstalling the beacon network. The plant can start with patrols and, during the pilot, enable e.g. permits or guest registration if the need arises.

This matters for the budget: a beacon network installed in two days also serves later scenarios. That is why the question about the pilot is not whether the plant buys only patrols, but which scope it wants to test first.

Conclusions for the maintenance manager

The three-stage pilot limits the risk of a decision to a small, clearly planned period. The manager does not have to shut down the installation, does not involve the IT department in a long project and has proof from their own patrols.

  • start with one patrol route, not the whole plant
  • set the success measures before installation: completeness, time, deviations
  • agree the installation locations in Ex zones with OHS and explosion protection
  • plan the scale conversation only after collecting data over 4-8 weeks

Checklist

Video

Frequently asked questions

Does installing beacons require shutting down the installation?

Not in the pilot model. The beacons are battery-powered and do not need a power connection, so 100 beacons across 8 floors are mounted in 2 days without stopping the installation.

How long does the whole pilot take?

About a week of preparation, 2 days of installation and 4-8 weeks of operational work. Altogether this is usually under three months from the first conversation to the decision.

Can more modules be added during the pilot?

Yes. 12 modules are available on the same instance, and enabling more of them does not require extra hardware or reinstalling the beacon network.