Pilot on one patrol route: 100 BLE transmitters

A maintenance manager does not have to digitise all patrols at once. One real route is enough: about 100 transmitters at inspection points and two measures, patrol completeness and response time to a fault. Below is the scenario for the first days of the pilot.

100
BLE transmitters on one pilot route
Source: card
10
licences in the pilot instance
Source: card

Why one route is enough to start

A production plant usually has several patrol routes: the hall, the boiler house, the warehouse, the yard and the switchgear rooms. Digitising all of them at once means a large project, training dozens of people and a difficult assessment of the result. A pilot on one route limits the risk and gives comparable material after just a few days.

The scenario applies to a concept for a production-type plant. The maintenance manager chooses a route where patrols are actually carried out and where faults occur, because only then does measuring response time make sense. A route without problems proves nothing.

What the pilot consists of

The patrol and inspection pilot is built on one real route. The kit is small and can be started without extensive integration with the plant's infrastructure.

  • About 100 BLE transmitters placed at inspection points, at a ratio of 1 transmitter per about 200 m².
  • A mobile application that also works offline, so the patrol does not depend on network coverage in basements or switchgear rooms.
  • 3 mobile devices for the people doing patrols on different shifts.
  • An instance of the system with 10 licences, enough for the patrolling staff, the manager and the people receiving reports.

How a transmitter confirms presence

The patroller approaches an inspection point and the application receives the transmitter signal and records that the point was visited. The position comes from signals of several transmitters averaged on the map, so it does not depend on GPS or on a single device.

What happens to a fault found on the way

A fault is reported from within the application, in the context of a specific point on the route. The report goes to the person responsible, and the time from report to closure is the second measure of the pilot.

Composition of the one-route pilot kit

Composition of the one-route pilot kitBar chart: 100 BLE transmitters, 10 licences and 3 mobile devices in the one-route pilot.020406080100unitsBLE transmitters: 100 units100 unitsBLE transmittersLicences: 10 units10 unitsLicencesMobile devices: 3 units3 unitsMobile devices
Source: InnerWeb patrol pilot kit (indicative)

Two measures collected by the pilot

The pilot measures patrol completeness and response time to a fault. The first measure answers whether every point was actually visited within the set window. The second shows how quickly someone acted after the problem was detected.

Completeness is the ratio of visited points to planned points. With paper patrols this indicator is usually assumed rather than measured. The pilot gives a number for the first time. Even if the result is high, the manager has evidence that can be shown during an audit.

Response time is counted from the time the report is saved to the first action. It is worth splitting it into two intervals: from detection to report, and from report to action. The first depends on the patroller, the second on the organisation of the plant, so the conclusions often differ.

Morning report: the effect visible on day one

The morning report shows the manager the effect already on the first day. It contains the list of points that were not visited, the list of reported faults and the status of their handling. The manager does not wait a week for a summary, but sees at once how the route is performing.

In practice the first report often shows things that are not visible on paper: a point skipped on every night shift, a section where the patrol takes longer than planned, or a fault reported over and over with no person assigned. These observations become material for a conversation with the team.

How to read the result after a few days

After a few days of the pilot the manager has the first comparative material. There is no need to wait months to judge whether the direction is right. It is enough to check three things: whether completeness is stable, whether response time falls and whether the patrollers accept the application.

If any of these looks weak, the conclusion is specific. Low completeness may mean that the points are placed too densely. Long response time suggests that no one clearly owns the reports. Reluctance to use the application calls for short training or a simpler report form.

The data from the pilot later serve as the justification for the board. The collected stage times and route results go into the decision documentation on moving to production, which is described on a separate page.

Video

Frequently asked questions

How long does it take to start a one-route pilot?

The kit is small: transmitters, three mobile devices and an instance with 10 licences. The first data appear on day one, in the morning report.

What if part of the route has no network coverage?

The mobile application works offline. Visited points and reports are saved on the device and synchronised once coverage returns.

Is GPS needed for the pilot?

No. Presence at a point comes from BLE transmitter signals, and the position is averaged on the map from several transmitters.

Which pilot data should be shown to the board?

Patrol completeness, response time to a fault and a few events that illustrate how the system works. These data go into the decision documentation on moving to production.

Check patrols on one route

Point us to the route where patrols cause the most problems. We will plan the pilot, the measures and the equipment scope with you.