The problem: a pilot that cannot stop operations
In a plant that runs continuously, every intervention in the infrastructure requires a permit, a service window and often a stop of part of the process. For this reason a maintenance manager usually rejects pilots that require electrical work, wall chasing or cable pulling.
The scenario described here is a pilot concept for a multi-floor facility of the process plant type. Its aim is to check whether rounds carried out by the operating staff can be confirmed and documented on a map, without changing how people work and without touching the installation.
Phase 1: about one week of remote preparation
The first week takes place without a visit to the plant. The supplier launches the instance, maps the floor layout and rounds points, and configures the route based on the documentation provided by the plant. The plant names the person responsible for the route and delivers a description of the points that the staff actually visit.
Remote preparation shortens the time spent at the facility. For installation the supplier arrives with a ready configuration, so the days on site are used for installation and tests, not for gathering requirements.
Duration of pilot phases (upper values)
Phase 2: two days of installation and tests
The pilot installs 100 transmitters across 8 floors. The transmitters are battery-powered, are not connected to a power supply and need no cabling, and the installation is not stopped. This means that installation requires no permits for electrical work and no shutdowns.
The first day is devoted to placing the transmitters and checking the signal along the route. The second day covers tests of passing the full route with a mobile device and training for the people who will carry out the rounds. After two days the pilot is ready for work on real tasks.
- 100 transmitters across 8 floors
- no power connection and no cabling
- no stop of the installation during installation
- test of passing the full route and training of the staff
Phase 3: 4-8 weeks on a real route
The third phase is the actual pilot. The staff carry out the rounds as before, and the system records passages through the points. Once a week the supplier and the plant meet for a short huddle, where they review missed points, difficult signal locations and remarks from the staff.
The length of the phase, from 4 to 8 weeks, makes it possible to see at least several full shift cycles and the weather that affects working conditions. Only such a period gives the manager data for a decision, rather than impressions from a single day.
What the manager assesses at the end
Three things are assessed: whether the route is covered in full, whether omissions are visible at once, and whether the staff accept the device in their daily work. If the answers are positive, the plant moves on to full rollout.
Conclusions for continuously running plants
Three features decide the success of such a pilot: battery transmitters without a power supply, a short stay of the supplier on site, and a steady, short huddle. All previous InnerWeb pilots moved on to full rollout (100%), but each started with a clearly defined route and a person responsible on the plant side.
It is also worth keeping the scope in mind: the pilot checks the rounds, it does not replace existing systems. InnerWeb complements the plant's systems and works independently of them.
Video
Frequently asked questions
Does the rounds pilot require electrical work?
No. The transmitters are battery-powered and need no power supply or cabling, so there are no shutdowns and no permits for electrical work.
How long does a pilot in continuous operation take?
About one week of remote preparation, 2 days on site and 4-8 weeks of work on a real route with a weekly huddle.
Does the installation have to be stopped during installation?
No. Installing 100 transmitters across 8 floors takes place without stopping the installation.
Plan a rounds pilot
Tell us how many floors your installation has, and we will propose a pilot plan that does not stop operations.
Let's talk