First 12 months of a BHP system cost: what is on the invoice and what is not

Purchasing compares offers by the supplier's invoice, but the full cost of the first year is higher by items the invoice does not contain. In the sample calculation one site and 10 users come to 37,000 PLN net over the first 12 months, and two sites with 50 licences come to 72,600 PLN net. Below is the cost structure and a list of items to add to your own spreadsheet.

37,000 PLN
first year, 1 site and 10 users (net)
Source: sample calculation
72,600 PLN
first year, 2 sites and 50 licences (net)
Source: sample calculation

What the first year consists of

The first year has three layers: one-off implementation, a subscription with licences and maintenance, and the pilot if it comes before full deployment. All amounts in this text are indicative ranges from 2025-2026 deployments; individual pricing applies.

Implementing the permit-to-work pilot is split into 7 items: analysis and workshops, server and accounts, mapping the procedure, switching cards, hazards, external companies, and testing and go-live. Payment is in three instalments, so in the purchasing spreadsheet spread the cost over three dates rather than entering it as one lump sum.

Pilot: fixed monthly rate

The monthly pilot rate of 1,650 PLN net covers the server, the instance, licences for 10 users, SLA, 100 BLE transmitters and 3 mobile devices. The pilot may run for several months at no extra cost, so moving the decision by one month does not raise the bill above the fixed rate.

The pilot offers 12 modules on the same instance, and enabling more does not require extra hardware or reinstalling the transmitter network. This removes items that appear in other offers as surcharges for extending the scope.

Cost of the first 12 months in two variants

Cost of the first 12 months in two variantsBar chart: 37,000 PLN for one site and 72,600 PLN for two sites and 50 licences.020,00040,00060,00080,000PLN net1 site, 10 users: 37,000 PLN net37,0001 site, 10 users2 sites, 50 licences: 72,600 PLN net72,6002 sites, 50 licences
Source: Sample calculation (indicative ranges from 2025-2026 deployments)

Licences: who is counted

A flexible licence costs roughly 80 PLN net per logged-in user per month, with a minimum of 10 users. Fixed packages for 50 and 100 licences cost about 2,500 PLN and 4,000 PLN net per month.

Licences count plant employees and coordinators of external companies who announce people and submit requests. Employees of external companies and guests are not counted. For purchasing this is an important difference: a list of external-company users does not raise the bill if those people do not submit requests.

  • Flexible licence: 80 PLN net per user per month, minimum 10 users.
  • Package of 50 licences: about 2,500 PLN net per month.
  • Package of 100 licences: about 4,000 PLN net per month.

Items outside the supplier's invoice

The items below do not appear on the invoice but do burden the project budget. We do not give amounts for them because they depend on the plant: enter your own rates and hours.

The largest of these is often the time of your own staff: the project coordinator, someone from health and safety, and someone from IT. The second is user training and any adjustment of internal procedures. The third is possible changes on the customer's systems if an integration is planned.

  • Hours of the project coordinator and staff from health and safety, IT and plant maintenance.
  • Training of users and induction for external companies.
  • Preparing site plans, accounts and the user list before start.
  • Changes on the customer's systems, if required for integration.
  • Server and network access: administrator time, firewall rule.
  • Reserve for extending the scope after the pilot.

Monthly licence cost

Monthly licence costChart: 800 PLN for 10 users on a flexible licence, 2,500 PLN for the 50-licence package and 4,000 PLN for the 100-licence package.01000200030004000PLN net10 users flexible (80 PLN)10 users flexible (80 PLN): 800 PLN net800Package of 50 licencesPackage of 50 licences: 2500 PLN net2500Package of 100 licencesPackage of 100 licences: 4000 PLN net4000
Source: Indicative ranges from 2025-2026 deployments

How to compare offers on the same basis

Ask every supplier for the same template: implementation cost, monthly subscription, number of licences, number of devices included in the price, SLA scope and conditions for extension. Only then is the first-12-month total comparable. Note that SLA parameters (availability, response and repair times) are set in the maintenance contract, e.g. 99.5% availability per month, so compare them in the same layout.

Example calculation

First year for one site and 10 users

Assumptions
ParameterValue
One-off implementation13 000 PLN net
Monthly subscription2 000 PLN net
Number of months12 months
Number of users10 licences

Result: 13,000 PLN + 12 x 2,000 PLN = 37,000 PLN net; for two sites and 50 licences 72,600 PLN net.

Note: Sample calculation based on the assumptions above; indicative ranges from 2025-2026 deployments; individual pricing applies. Does not include items outside the supplier's invoice.

Video

Frequently asked questions

Does the pilot have extra time-based charges?

The monthly rate of 1,650 PLN net covers the server, the instance, licences for 10 users, SLA, 100 BLE transmitters and 3 mobile devices. The pilot may run for several months at no extra cost.

Do guests count towards licences?

No. Plant employees and coordinators of external companies who submit requests are counted. Employees of external companies and guests are not counted.

Where are SLA parameters set?

In the maintenance contract: availability, response and repair times are set in the contract, e.g. 99.5% availability per month.

Let us calculate the first year for your plant

We will prepare a quote in one template with a list of items outside the invoice, so that purchasing compares offers on the same basis.