Additional or mandatory trainings: recommendations

In the system the OHS manager has three types of training: mandatory for entry, required by a permit, and additional. Wrongly marking a training as mandatory blocks the gate unnecessarily, while marking a critical one as additional removes its requirement. Below are recommendations on how to separate these types.

3
training types: mandatory for entry, required by a permit, additional
0
entry blocks caused by an additional training

Who these recommendations are for

The recommendations are addressed to the OHS manager, the coordinator of external companies and the system administrator, who decide what the system checks at the gate. Every training must be assigned to one of three types, and it is worth doing this split before the materials are loaded, not after.

An additional training uses the same engine as the others (video, PDF, test), but it is voluntary. It never blocks entry to the system or the performance of work, and it is not treated as required at a gate check. This is the only feature that distinguishes it, and the recommendations below rest on it.

Recommendations 1 and 2: the gate criterion and the permit criterion

Recommendation one: only what is needed to enter the site, without which entry creates a risk for the person or for others, is mandatory at the gate. Examples are the initial OHS training, evacuation rules and assembly points. If the lack of a training is meant to stop a person at the gate, it is not an additional training.

Recommendation two: assign a training that conditions a specific job, for example hot work or work in a confined space, to a permit, not to the gate. This way an office worker does not have to pass it, and a contractor doing hazardous work will not start the job without passing it.

For both criteria, ask a test question: can a person without this training safely enter or perform the task? As written in the source rule, an answer no means additional and an answer yes means mandatory at the right place in the process.

Recommendations 3 and 4: what to leave as additional

Recommendation three: mark as additional the trainings that raise competence, new procedures before they take effect, seasonal briefings and trainings for selected groups. The common feature is that they are sent widely before the participants are known, which is why the link and QR code are assigned to the training, not to a person.

Recommendation four: do not move an additional training to mandatory just to force attendance. A blocked gate hits production and external companies, and the result is workarounds. It is better to send invitations and monitor overdue people through the named register.

If an additional training turns out to be critical, move it deliberately to mandatory or to a permit, and record the decision with a date. The type of training is an organizational decision, not a property of the material.

Recommendations 5 and 6: expiry dates and language

Recommendation five: set expiry for recurring trainings. The system warns employees and employers before medical examinations, trainings and documents expire, so that nobody learns about a lack of validity on the day of work. For additional trainings the warning is information, not a block.

Recommendation six: take care of language. The account language chosen at registration (Polish or English) determines the training language. When the plant has no training in that language, the gate requires the Polish OHS training instead of skipping it. That is why a mandatory training must have a version for every language your workforce uses.

Do not promise trainings in every language: availability depends on the plant's materials, and a language version is added by preparing a video or a PDF with a test.

Recommendation 7: order of rollout

Start with a list of all existing plant trainings and assign each to one of the three types. Record the reason for each item. Review the table once a quarter, because the plant changes its procedures, and the training type should keep up with them.

Only after this table should you load the materials into the system. Then the entry test is short, and additional trainings do not dilute the safety message.

Video

Frequently asked questions

Can an additional training be changed to mandatory?

Yes, it is an organizational decision. Record the reason and the date of the change.

Will a missing additional training stop an employee?

No, it never blocks entry or the performance of work.

How are expiries notified?

The system warns employees and employers before trainings and documents expire.

What if there is no training in the employee's language?

The gate requires the Polish OHS training instead of skipping it.

Split of trainings at your plant

We will go through the list of trainings with you and assign them to the three types. Book a talk.