Problem: an invitation with no address
At a steelworks, part of the workforce works at furnaces, rolling mills and storage yards, where nobody uses electronic mail. HR holds an employee register number for these people, but no address and no phone number. A typical training system assumes the invitation goes out by email or SMS, so an employee without either channel drops out of the process at the very first step.
The OHS manager then has two bad options: run a separate paper process for these people, or enter made-up addresses. The first takes the problem outside the system and breaks the records. The second corrupts the data, because reminders about expiring trainings go nowhere. This scenario shows a third path, one that stays inside the system.
The invitation is kept in the system as a named register: it records who was invited and through which channel (email, SMS, QR code). This way, even a person served without email stays visible on the list of overdue employees.
Solution: an internal account on the register number alone
The field that identifies a person in the interface is called Employee register number. The organization assigns it, it is unique in the system, and it works as an anonymizing identifier. It does not have to be a PESEL number or any other personal data; a number from the payroll list or the employee card is enough.
An internal employee account can be created on this number alone when the person has neither email nor phone. Exactly one identifier out of three is required: the register number, an email address or a phone number. The administrator therefore does not invent substitute addresses, and the account is correct from the start and ready for training assignments.
When an invitation cannot be delivered through any channel, the system shows a link and a QR code for the training, with an option to copy the data and download the code. The shift supervisor can print it, post it in the break room or show it on a tablet.
Employees by available contact channel
How it works at the workstation, step by step
The employee opens the link or scans the QR code with a colleague's phone, a kiosk or the crew's tablet. They enter their register number. After entering through the link with a number, the system asks: Is it you? Only after confirmation does it start the next required training for that person.
This confirmation matters in practice. On a shared crew device it is easy to mix up the logged-in account, and the question stops a training from being passed by someone else. After completion, the result goes to the record of the right person, and expiry reminders are counted from that date.
The account thread and the training thread are independent. The same register number serves entry training, additional trainings and later trainings required by permits. There is no need to create a second account when the employee gets a phone later.
Effect for the workforce: sample calculation
For scale, assume a plant with 400 employees, 12 percent of whom have no electronic contact channel. That is 48 people for whom a standard invitation will not work. The assumptions are explicit, and each plant enters its own figures, because the share depends on the structure of employment.
Without an account on the register number, those 48 people would need a paper list and manual transcription of results into the register. With an account on the register number, all 400 people sit in one register, and the OHS manager sees one list of overdue trainings, not two. The gain is consistent records and no double work, not time savings alone.
Conclusions for the OHS manager
Before launch, check with HR that every employee has a register number and that it is unique across the whole plant, including agency workers. The number must be stable, because the training history rests on it.
Decide who issues the link and QR code to people without contact channels and where they are posted. Keep in mind the consciously accepted risk: anyone who knows another person's register number can pass a training in that person's name. We describe how to limit it on the page about the risk of someone else's number.
Employees without a contact channel
| Parameter | Value |
|---|---|
| Number of employees | 400 people |
| Share without email and phone | 12 % |
Result: 48 people need an account on the register number and a link or QR code handed over in person.
Note: Sample calculation based on the assumptions in the table; it does not describe a specific plant.
Video
Frequently asked questions
Must the register number be a PESEL number?
No. It is an identifier assigned by the organization, unique in the system and anonymizing, so it can be a number from the payroll list.
What if the employee gets a phone later?
The account stays the same. A phone number or email can be added to the existing account, and the training history stays with the number.
Does the link work without creating an account?
At the additional training gate the person identifies themselves with the number, a company email address or a phone number, without creating a separate account.
Where will I see who did not get an invitation?
The invitation is a named register with the channel type, so the list of overdue employees is available in the system.
Employees without email at your plant
We will show the account on the register number and the QR code link using the list of employees from your plant. Book a talk or a demo.
Let's talk