Solvent risks assigned to locations in the print hall

Solvents in a printing plant are not a risk for the whole site, but for specific places: the paint store, the washing station, the area around the machine. The recommendations below show the OHS manager how to assign risks to locations and to the work, so that the worker sees them before starting.

3 h
minimum supervision after hot work before closing
Source: card

Who these recommendations are for

We address these recommendations to the OHS manager of a printing plant, who is responsible for risk assessment and wants its result not to sit in a binder. They apply to printing plants where solvents, inks and cleaning agents occur in several places, and where their presence is decided by location, not by the worker's position.

The recommendations concern how data is organised in the system. They do not replace risk assessment, the selection of ventilation or the rules on hazardous substances: they help the results of that assessment reach a person before they start work.

Recommendation 1: start from locations, not from a list of substances

List the places where workers or contractors come into contact with solvents: the chemicals store, the ink preparation station, the roller washing zone, the area near the dryer. Only then assign risks to those places. A list of substances without locations forces the worker to guess which entries concern them.

Risks can also be edited from the 3D map editor for a given building floor, which makes the OHS manager's work easier: they see the place and add the risk where it occurs.

Supervision schedule after hot work

Supervision schedule after hot workBar chart: monitoring after 1 hour, monitoring after 4 hours, closing after at least 3 hours of supervision.01234hoursFirst monitoring: 1 hours1 hoursFirst monitoringSecond monitoring: 4 hours4 hoursSecond monitoringMinimum before closing: 3 hours3 hoursMinimum before closing
Source: Documentation of the especially hazardous work and risks function

Recommendation 2: link the risk to the work that triggers it

The risk catalogue is assigned to the work, and the worker sees it before the work starts. For solvents this means that roller washing, filter replacement and service work near the chemicals store have their own sets of risks, not one general description.

Especially hazardous work, meaning hot work, work at height and work in confined spaces, requires a knowledge check, approval by an internal user of the plant and, for fire work, supervision after completion. In a printing plant this matters where welding or grinding takes place near fumes.

Recommendation 3: plan supervision after hot work

For hot work the system forces monitoring after 1 hour and after 4 hours, and closing is blocked until at least 3 hours of supervision have passed. In an environment with solvents this rule makes practical sense: a smouldering fire after work is exactly the kind of event that is hard to notice.

The OHS manager should enter in the template who carries out the monitoring and agree it with the shift supervisors. Lack of a person assigned to monitoring is the most common cause of delays in closing a permit.

Recommendation 4: check the data from the worker's perspective

After entering the risks, step into the role of the contractor: open the permit as the service engineer would see it, and check whether the risk description is understandable without knowing the plant. If it needs the supervisor's comment, the text must be rewritten.

Changes to the risk catalogue are data changes, not code changes, so the OHS manager can correct them on an ongoing basis without waiting for a software update. It is worth agreeing how often to review them, for example after each change of technology or solvent supplier.

  • Collect a list of places with solvents in the hall.
  • Assign risks to locations and to the work that triggers them.
  • Decide who carries out monitoring after hot work.
  • Review the descriptions from the point of view of an external contractor.

Video

Frequently asked questions

Does the system assess the risk instead of the OHS manager?

No. The assessment is made by a person, and the system delivers the results to the worker before work starts and records evidence that they were shown.

Can risks be changed without the software supplier?

Yes. The risk catalogue is the plant's data, which the administrator corrects in the panel or in the 3D map editor.

Do these rules apply only to solvents?

No. The same logic works for other risks assigned to locations, for example height or confined spaces.