InnerWeb
Skip to main content

FAQ: Hazard Map of the Print Hall, Questions from the Health and Safety Manager

A health and safety manager at a print shop who starts assigning hazards to places in the building asks about practice: where to edit hazards, what a contractor sees before work and how to link the solvent store with hot work. The answers below describe how the hazard catalogue and the 3D map editor work in InnerWeb.

3 h
minimum supervision before a hot work permit can be closed
Source: dangerous work feature sheet
25-50
transmitters for a 5,000 m2 hall, sample calculation
Source: sample calculation: 1 transmitter per 100-200 m2

Where hazards are edited and what building level means

The first question concerns the place of work in the system. Hazards assigned to a job form a catalogue, and they can also be edited from the 3D map editor, separately for each building level. For a print shop this means the fire hazard of the solvent store and the mechanical hazard of the machine hall do not have to share one description.

A building level is, in practice, a floor: the hall on the ground floor, a mezzanine with auxiliary machines, a warehouse or an office floor. The safety manager assigns hazards to it the way they do in an occupational risk assessment, except that the result has coordinates and is not a general document in a binder.

Do hazards have to be assigned to every room?

No. It is best to start with the levels where hazardous work takes place or where many people from external companies work, such as the machine hall, the solvent store and the ramp. The map does not require completeness from day one, and each further level can be added after an internal audit.

How many transmitters are needed for a hazard to be assigned to a place?

Assigning a hazard to a level on the map does not depend on the number of transmitters, only on editing the map. Transmitters affect the location of people: in a building, roughly one transmitter per 100 to 200 m2 is assumed, and the position is averaged from the signals of several transmitters. For a print hall of 5,000 m2 this gives between 25 and 50 transmitters.

What a worker sees before starting work

Before starting work, a worker sees the catalogue of hazards assigned to the job. For a contractor doing service on a printing machine, the catalogue shows the hazards the safety manager considered important for this job, not a generic list from a template prepared for the plant.

It is therefore worth writing hazard descriptions as they should be read by a person just before entering the hall: specifically, with the place, the preventive measure and the consequence. A description such as "solvents are dangerous" adds nothing, while a description with a location and a preventive action gives the contractor a decision to make.

  • Place: the building level and the zone where the hazard occurs.
  • Event: what can happen, in one sentence.
  • Preventive measure: what the contractor does before and during the work.
  • Linked work: which hazardous work the catalogue entry refers to.

Transmitters for a 5,000 m2 hall (sample calculation)

Transmitters for a 5,000 m2 hall (sample calculation)Bar chart: 50 transmitters at a density of 1 per 100 m2 and 25 at 1 per 200 m2 for a 5,000 m2 hall.01020304050pcs1 per 100 m2: 50 pcs50 pcs1 per 100 m21 per 200 m2: 25 pcs25 pcs1 per 200 m2
Source: Sample calculation: 5,000 m2 area divided by a density of 100-200 m2 per transmitter

Hazards and hot work next to the solvent store

In a print shop, hot work close to the solvent store is the most common point of dispute between production and maintenance. The system supports settling it in two ways. Particularly hazardous work, meaning hot work, work at height and work in confined spaces, requires a knowledge check, approval by an internal user of the plant and, for fire work, supervision after completion.

For hot work, the system enforces monitoring after 1 hour and after 4 hours in sequence, and closing the permit is blocked until at least 3 hours of supervision have passed. If the fire hazard is assigned to the level on which the solvent store is located, the contractor sees it before work, and the safety manager has proof that the information was made available.

Changes to the hazard map after an audit or an incident

The hazard map is not a one-off document. After an internal audit, a potentially accidental event or a change in the layout of machines, the safety manager edits the hazards on the right level, and the change is visible to the next contractors. This requires no code change and no deployment of a new system version, because hazards are the plant's data.

A good rhythm for a print shop is a review of the map once a quarter and after every change in the layout of machines or the store. The review covers three questions: whether the hazard still exists in this place, whether the preventive measure is current, and whether it applies to a new job that is not yet in the catalogue.

Limits of the hazard map: what is evidence and what is not

The hazard map provides audit evidence that hazards were assigned to a place and visible to contractors before work. It does not replace the occupational risk assessment or the safety manager's decision to admit the work; it organises the result of these and makes it available at the moment it matters.

InnerWeb is a software producer. Industrial beacons with ATEX design for zones 2 and 22 are selected for places where an explosive atmosphere occurs, and the assessment of the zones is carried out by an authorised person on the plant's side.

Video

Frequently asked questions

Does changing a hazard on the map require help from the vendor?

No. Hazards are the plant's data and are edited in the 3D map editor for the given building level. The change does not require deploying a new version.

Does a worker have to read the hazards before starting work?

Before starting, they see the catalogue of hazards assigned to the job. Particularly hazardous work additionally requires a knowledge check and approval by an internal user.

How long does supervision after hot work last?

The system enforces monitoring after 1 hour and after 4 hours, and closing the permit is blocked until at least 3 hours of supervision have passed.

Let us assign hazards to your hall

We will show the 3D map editor and the hazard catalogue on a sample building and agree which levels are worth starting with.

Let's talk