Contractors in a printing plant: guidance for the shift supervisor

On the afternoon shift of a printing plant there is usually no OHS department, yet external contractors still arrive. The guidance below covers what the shift supervisor should set up in the system beforehand, so as not to make admission decisions from memory.

Who the guidance is for

The guidance is intended for the shift supervisor of a printing plant who, in the afternoon or evening, is responsible for the hall alone or together with security. At these hours service engineers, cleaning companies and renovation contractors most often come in, because they do not disturb daily production.

The aim is for decisions that the OHS department would normally make to be already recorded in permit templates, so that the shift supervisor only has to approve or suspend a specific permit.

Guidance 1: establish who is an internal user on the shift

A permit may be suspended by an internal user, while the administrator can always resume it, and another internal user only after completing all the required unblocking tasks. This leads to an organisational conclusion: on the afternoon shift a person with internal user rights must be named, along with who is available as administrator.

If the administrator is available only during the day, the shift supervisor must know that resuming after a suspension will be possible only after the unblocking tasks have been done. It is worth checking this before the first shift with contractors.

Guidance 2: prepare the unblocking tasks in advance

Suspension blocks the closing of all tasks except the list of unblocking tasks. A shift supervisor who suspends a permit should not invent this list during the event. It should follow from the type of work: fixing a safeguard, completing a marking, or confirmation again by the supervisor.

Detailed rules for choosing such tasks are described in a separate best practice on suspending contractor work. Here the essential point is that the list must be ready in the template before the contractor enters the hall.

Guidance 3: remember that suspension does not stop the clock

Suspension does not stop the permit clock: the deadline keeps running, and after resumption the permit may be past its deadline and need a separate extension. On the afternoon shift, when the time for work is limited, this is a real risk: the contractor loses hours on correction and the permit expires before the end of the shift.

When issuing a permit, the shift supervisor should leave a time margin and know how to extend the permit if the suspension turns out longer than expected.

Guidance 4: verify clearance by the signal on the card

On the contractor's card, green frames and the label Working mean only clearance to the main work, not merely joining the crew. The shift supervisor, when touring the hall, can ask a contractor to show their phone: the green frame is the only signal that means permission to work.

If a contractor has a card without a green frame while working at a machine, this is a situation to clarify immediately. It is a simpler check than comparing paper lists.

  • Name a person with internal user rights and an administrator on standby for the shift.
  • Prepare the list of unblocking tasks in the template, not during the event.
  • Leave a time margin in the permit deadline.
  • Check the green frame on the contractor's card during the tour.

Video

Frequently asked questions

Can any employee suspend a permit?

A suspension may be made by an internal user when the contractor has done something that needs correcting. The shift supervisor should have this permission assigned for the duration of the shift.

What if the permit expired during the suspension?

After resumption the permit may be past its deadline and need a separate extension, because the clock ran throughout the suspension.

Does the contractor see the reason for the suspension?

The contractor sees the unblocking tasks that must be done so that the permit can be resumed.