Permits in a moulding plant: seven recommendations for the maintenance manager

The maintenance manager of a moulding plant issues permits for machine service and mould changes every day, across several shifts and with the involvement of external companies. Below are seven recommendations that organise this process and show which system functions support them.

7
recommendations for the maintenance manager
Source: InnerWeb analysis
8
states of particularly dangerous work
Source: system feature documentation

Who these recommendations are for

The recommendations are addressed to the maintenance manager of a plastics processing plant, who is responsible for the machines and moulds and signs off on the safety of service work. We assume the plant has a dozen or several dozen injection machines and uses external service companies.

InnerWeb is a software vendor and works as an independent system that complements the plant's existing systems. The recommendations do not require replacing machines, and they support compliance and provide evidence for audits, without promises of legal conformity.

Recommendations 1 to 3: structure of the work

The first three recommendations concern how to arrange responsibility before you start talking about forms.

1. Treat particularly dangerous work as a separate object

Particularly dangerous work is a separate object attached to the permit and has its own state machine. This makes it possible to approve, monitor and close it independently of the general service document.

2. Separate the permit status from the work status

Particularly dangerous work and the permit status are two independent modes. Unclosed work does not block the permit from moving between phases, so the document can move forward while the risky work remains visible as open.

3. Keep approval on the plant side

Only a user on the plant side can approve or reject particularly dangerous work. The recommendation is simple: external companies report, and the plant decides, including at night.

Order of rolling out the recommendations: start week (proposal)

Order of rolling out the recommendations: start week (proposal)Bar chart shows the start week of each recommendation in the pilot.01234weekResponsibility: 1 week1 weekResponsibilityTemplates: 2 week2 weekTemplatesQualifications: 3 week3 weekQualificationsRisks: 3 week3 weekRisksAudit review: 4 week4 weekAudit review
Source: Proposal for the order of the pilot implementation, illustrative calculation

Recommendations 4 to 7: daily practice

The remaining four recommendations translate into the supervisor's everyday decisions.

4. Introduce templates for repeatable work

The task template is selected for the location and the contractor company. Start with mould changes and hydraulic inspections, which are the jobs that come back most often.

5. Enable qualification checks when creating a permit

The system automatically checks whether the assigned employees hold valid qualifications, medical examinations and training. The supervisor no longer checks documents by hand for every permit.

6. Keep the risk catalogue in one place

The risk editor lets the administrator and health and safety add a missing risk once, after which it can be selected by everyone who issues permits. You avoid several versions of the same hazard, described differently on each shift.

7. Treat the audit trail as a working tool

Changes to permits, the taxonomy of dangerous work and training results are recorded with the author and time. Use it during reviews after incidents, not only during audits.

Where to start

The most sensible approach is to choose one hall and two types of work: mould change and hydraulic service. After four weeks you can see which templates work and which need refining. Recommendations 5 to 7 can be introduced in parallel, because they do not require additional work from the shift supervisors.

A sample order: first the division of responsibility, then templates, then qualifications, and finally a review of the audit trail after a month of work.

Video

Frequently asked questions

Do the recommendations require replacing machines?

No. InnerWeb is an independent system that complements the plant's existing systems and does not interfere with injection machine controls.

Which recommendation should be started first?

The division of responsibility: the plant approves, the contractor reports. The rest builds on this split.

Does the audit trail cover training?

Yes, changes to permits, the taxonomy of dangerous work and training results are recorded with the author and time.

Let us plan a pilot of one hall

Book a conversation with the InnerWeb team and decide which of the seven recommendations to implement first in your plant.