FAQ: injection plant safety, work permits and closing jobs

A shift manager at an injection moulding plant makes several decisions in one shift that need an answer on the spot: whether a contractor can start servicing a machine, who has the authority to approve the work, and when it is safe to close it. We collected nine of the most frequent questions, each answered on the basis of how the InnerWeb permit module works.

8
states of hazardous work
Source: karta
3 h
minimum time before closing hot work
Source: karta
5
risk sections on the permit printout
Source: karta

Who approves hazardous work, and why does the contractor not do it?

Only a user on the plant side can approve or reject hazardous work. An external contractor, for example a hydraulics service team for an injection machine or a company supplying tools for a mould change, submits the request, but the decision belongs to the person responsible for the hall and who knows its current state.

This split matters in an injection plant. The contractor does not see that a mould change is under way on the neighbouring machine, or that a power feed in the cable duct under the hall has just been switched off by someone else. The approver sees the whole picture and answers for it to the plant. The system reflects this split in user permissions, not in a paper procedure that nobody checks at three in the morning.

How does the lifecycle of a hazardous work item look in the system?

Hazardous work is a separate object linked to the permit and has its own state machine with eight states: submission, knowledge check, approval, rejection, opening, monitoring every hour, monitoring every four hours, and closing.

For the shift manager three moments count. The first is the knowledge check: before the work reaches approval, the system verifies that the contractor knows the hazards. The second is approval by a person from the plant. The third is closing, which is not a formality, because the system blocks it in specific situations. The next questions explain them.

Risk level thresholds in the assessment

Risk level thresholds in the assessmentFour risk level thresholds: 20, 70, 200 and 400 points.0100200300400pointsThreshold 1Threshold 1: 20 points20Threshold 2Threshold 2: 70 points70Threshold 3Threshold 3: 200 points200Threshold 4Threshold 4: 400 points400
Source: Documentation of the risks and hazardous work functions

Can the work be closed while someone is still at the station?

No. The system does not allow a hazardous work item to be closed while more than one worker remains on site. This protects against a typical situation on the floor: a team lead finishes the job and closes the permit from a phone on the way to the locker room, while two people are still clearing up around the machine where energy isolation was carried out.

For the shift manager the conclusion is practical: closing the permit means the place is empty, not that someone has declared it so. When handing over service between shifts, it is worth explaining this to the crews at the briefing, so nobody searches for the cause of a block.

How does monitoring work for hot work, for example welding near a mould or a machine?

For hot work, monitoring is carried out at set intervals: first every hour, then every four hours. The monitoring is done by an external worker acting as a fire watch. Closing is blocked until at least three hours have passed since the work ended.

In an injection plant the reason is the nature of the materials: granulate, hydraulic oil and anti-adhesion agents create an environment in which a spark can smoulder for a long time after welding ends. The time lock forces observation during the period when the fire risk is highest, and it leaves a record that the observation took place.

Does an unclosed hazardous work item hold up the whole permit?

No. Hazardous work items and the permit status are two independent modes. Unclosed hazardous work does not block the permit from moving between phases. The permit can therefore move on to the next phase while fire watch monitoring continues in parallel.

This arrangement prevents a formality from blocking a shift, but it does not weaken supervision: the closing of each work item is decided by its own rules, for example the number of people on site or the passing of three hours. The shift manager sees both statuses separately and does not have to mix them up.

What happens to hazardous work tasks when the permit starts?

When the permit starts, open hazardous work tasks move from preparation to the main works. There they are confirmed by the contractor or the administrator. This way the list of actions, such as cutting power to the machine or securing the hydraulic circuit, does not get lost along the way and stays with the work until the end.

In practice, energy isolation on an injection machine covers several sources at once: electrical, hydraulic, pneumatic and residual heat in the barrel. Tasks in the system let you break these down step by step and confirm each one separately, instead of relying on a single general note.

How does the system check whether people from an external company can carry out the service?

When a permit is created, the system automatically checks whether the assigned workers hold the required, valid qualifications, medical examinations and training. Required qualifications are defined separately for each type and subtype of hazardous work on a dedicated screen, so a service job involving fire has different requirements than work at height.

The system also warns workers and employers before documents expire, ahead of the working day. For the plant this means no discovering on the day of service that a technician's medical examination expired two days earlier. Details for maintenance managers are covered in our recommendations on technician qualifications.

Which risks appear on the permit printout, and where do they come from?

Risks on the printout are assembled into five sections with deduplication: risks shared between permits, the hall, area, line and location hierarchy, additional locations, the type of hazardous work, and risks added by the issuer. The same item does not appear twice, so the printout stays readable.

If a risk specific to the injection plant is missing, an administrator or an OHS specialist adds it once in the risk editor, and it is then selectable for all issuers. There is no need to type it in by hand for every permit.

Does the risk always drop after protective measures, and do changes leave a trace?

In the risk assessment after protective measures, usually only the probability drops, while exposure and severity stay the same. The risk level thresholds are 20, 70, 200 and 400. The takeaway for practitioners: isolating the power reduces the chance that the machine starts, but it does not change how serious the outcome would be if it did start.

That is why the residual risk value should be read together with the initial level, not separately. The OHS specialist has full control over matching the assessments to the realities of the hall.

Yes. Changes to permits, the taxonomy of hazardous work and training results are saved in an audit trail with the author and the time. During an inspection or incident analysis it is possible to reconstruct who changed the scope of work, when, and on what basis.

InnerWeb is a software producer and works as an independent system that complements the plant's existing systems, so the audit trail covers what happens in the permit module and does not replace documentation kept in other systems.

Video

Frequently asked questions

Can the contractor close the machine service work alone?

Closing a hazardous work item is subject to system rules: it will not go through while more than one person remains on site, and for hot work it requires at least three hours to pass. However, the approval of the work is decided by a user on the plant side.

Can the shift manager reject the work?

Yes. Rejection is one of the eight states of hazardous work and is available to a user on the plant side, just like approval.

What about the permit while fire watch monitoring is still running?

The permit can move between phases, because hazardous work and permit status work independently. Monitoring continues in parallel, and the work itself is closed only after its own conditions are met.

Does the system warn about expiring medical examinations of technicians?

Yes. The system warns workers and employers before documents expire, ahead of the working day.