Five devices, one restriction
The employee device ecosystem covers five types: the BLE beacon, the active card, the multi-charger, the watch and the ATEX radio telephone. They are chosen to match what the site already has, not the catalogue. In a potentially explosive zone the restriction is the construction of the device, not the software function.
InnerWeb is a software manufacturer. The InnerWeb industrial beacon has an industrial design, a CE declaration and an ATEX construction for zones 2 and 22. Active cards, multi-chargers, the watch and the radio telephone are bought from suppliers and integrated by us, so the equipment supplier is responsible for its certification.
Recommendation 1: ATEX-construction beacons as the backbone
Build the backbone of the location in zone 2 or 22 from beacons with an ATEX construction for these zones. The industrial-battery beacon works for several years in the range from -40 to 60 degrees Celsius and needs no cabling, which simplifies installation in places with restricted work.
The location results from signals of many beacons averaged on the map, indoors at about one beacon per 100 to 200 m2, and along plant roads about every 100 m. It works without GPS, so it does not depend on the view of the sky between installations.
Installation lead time in weeks from the order
Recommendation 2: ATEX radio telephone where the site already has one
If the site uses radio telephones in the ATEX construction, they are the natural carrier of voice communication and there is no reason to replace them. Their sensible role is communication, while the location is provided by the beacon network, not by the radio telephone alone.
We treat the integration as an option to be agreed: the radio telephone is bought from a supplier, so the assessment of its admission to the zone belongs to the manufacturer and to the person responsible for the explosion protection documentation.
Recommendation 3: watch and card only with confirmed admission
A watch and an active card may enter a potentially explosive zone only if the specific model has a confirmed admission for the given zone and group. Without such a document the device stays outside the zone, and the employee leaves it at the entrance.
For an employee in such a zone the sensible order is: first check whether the model has an admission, then check how the device behaves at low temperature and in dust, and only then issue it for the shift. Do not assume that a watch admitted to zone 2 is admitted to zone 22.
- request from the supplier an admission document for the zone and group
- check the device temperature range against the conditions at the site
- establish where the employee leaves a device that is not admitted
- record the decision in the explosion protection documentation
Recommendation 4: charging outside the zone
Place the multi-charger outside the potentially explosive zone. Devices return to it after the shift, and issue and return take place in a safe place, for example in the locker or the warehouse. Only what has an admission and works longer on battery is left in the zone.
A watch with a rechargeable battery needs charging every few days, so with this approach the rotation of devices takes place at the charging point, not in the zone.
How to decide: questions to ask before buying
Before choosing a device, answer four questions: in which zone and group will it work, whether the site already has ATEX radio telephones, whether it needs voice communication or only location and SOS, and where it will be charged. The answers narrow the choice to one or two device types.
In case of doubt, start from the network of ATEX-construction beacons and the radio telephone the site already has, and add the watch and the card only with a confirmed admission.
Video
Frequently asked questions
Can the InnerWeb radio beacon work in an Ex zone?
It has an ATEX construction for zones 2 and 22 and a CE declaration. The specific application is assessed by the person responsible for the explosion protection documentation.
Will a SOS watch enter an Ex zone?
Only a model with a confirmed admission for the given zone and group. InnerWeb buys and integrates watches, so the admission is provided by the manufacturer.
Where should devices be charged?
Outside the potentially explosive zone, in the locker or the warehouse, together with the issue and return procedure.
Sources
Let's match the equipment to your zone
Send us the zone classification and the list of radio telephones you have. We will indicate what to keep, what to add and what not to introduce without an admission.
Let's talk