Five device types and what each one does
The worker device ecosystem has five types: a BLE beacon mounted in the facility, an active card, a multi-charger, a watch and an ATEX-rated radio. They are chosen based on what the plant already has, not the other way round. A beacon is not worn. It is a transmitter in the infrastructure that lets the other devices establish where they are.
An Android phone and a Wear OS watch run the same LiveWorker app. The app scans BLE beacons, detects stillness and falls, and periodically sends the beacons it hears, signal strength, battery level and status. From this data the platform knows the worker's position without GPS. An active card is cheaper and simpler, but it has no screen and no app, so it cannot replace a watch where a person must confirm an alarm.
InnerWeb is a software producer. The industrial beacon has an industrial design and a CE declaration, while active cards, multi-chargers, watches and radios are bought from suppliers and integrated. For purchasing and OHS this has a practical consequence: one supplier is responsible for the whole, and the hardware does not depend on a single manufacturer.
Three questions that decide the choice
The first question concerns hands: does the worker wear gloves, or operate a machine with both hands? With gloves the phone touchscreen is ruled out as the only channel, and a watch with a physical button or a card that needs no interaction works better. The second question concerns alarms: does the role require the worker to call for help personally? Solo work in the yard, a warehouse or during a patrol requires a device with a button, that is a watch or a phone.
The third question concerns the environment: is a phone allowed in the zone? In zones that ban phones and where ignition risk is high, an active card and an ATEX radio come into play. The answers to these three questions, recorded for each role, form the selection document. Without it, the rollout rests on beliefs rather than requirements.
Indicative price ranges for devices (net)
Selection by workplace
Below is a breakdown by case, in the order in which they most often appear in real rollouts.
Production hall
A machine operator works in gloves and often in noise. A watch with an SOS button and vibration usually works best, supplemented by a card for people who cannot wear anything on the wrist. The position comes from several beacon signals averaged on the map; in a building, one beacon per 100-200 m2 is planned.
Yard, outdoor warehouse and plant roads
Work in the yard is usually solo, and coverage depends on beacons placed about every 100 m along the plant roads. A watch with SOS and stillness detection is the basic device here. Drivers entering the site receive a tracker issued at the gate, which requires a multi-charger and a return procedure.
Office and administration
An office worker usually has a company phone. The app on the phone is enough to register presence in zones and to receive evacuation messages. A watch in the office is unnecessary unless the person goes onto the hall floor.
Restricted zones
Where phones are prohibited, or where ignition risk requires a special design, consider an active card or an ATEX radio. Selecting the device for an Ex zone belongs to the person responsible for explosion hazard documentation. The system supplies position data and does not certify third-party devices.
Putting the requirements into one table
Build a table where the rows are roles and the columns are four features: work in gloves, solo work, restricted zone, required alarm confirmation. Enter yes or no. A role with solo work and no restrictions gets a watch or phone, a role with a restriction gets a card or radio, and a role with none of these features may use the cheaper solution. Such a table fits on one page and is readable for management, purchasing and the inspector.
Count the people in each group, because that number determines the multi-chargers, the number of spare devices and the cost. Indicative price ranges from 2025-2026 deployments (individual quotation): active card PLN 220 one-off, card housing PLN 40, 28-slot multi-charger PLN 3,400 net. Under rental, an industrial beacon costs PLN 7 net per unit per month. Do not treat these figures as an offer, only as an order of magnitude for an initial budget.
Proof for the audit and the rollout order
An OHS auditor or an insurer will ask on what basis the devices were assigned. The selection table, the assignment list and the alarm log from the system form such evidence. The system supports meeting the requirement for risk assessment of solo work, but it does not replace the risk assessment itself.
Roll out in stages: first one hall and one role, then the next. Beacon installation takes 2-10 weeks from the order, so it is worth ordering devices and infrastructure in parallel. After the first month, review which devices lie unused and correct the table rather than buying more units.
Video
Frequently asked questions
Is one device type enough for the whole plant?
Rarely. Roles differ in glove work, solo work and zone restrictions, so usually two or three device types are needed. The system runs them in parallel on one map.
Does a watch work without a phone?
A Wear OS watch runs the LiveWorker app on its own, scans BLE beacons and detects stillness and falls. The LTE variant is managed as a fleet through MDM.
Does an active card have an SOS button?
It depends on the card model bought from the supplier. Where a deliberate call for help is required, plan a watch or a phone.
Who is responsible for the selection in an Ex zone?
The person responsible for explosion hazard documentation. The system supplies position data and alarms but does not certify third-party devices.