What we need to count
A multi-charger is a station with many slots, in which devices recharge their batteries and wait to be issued. The reference valuation covers a 28-slot model at approximately PLN 3,400 net (ranges from 2025-2026 deployments, individual quotation). In an example fleet of 40 trackers for drivers, two 20-slot multi-chargers at approximately PLN 4,500 each are planned.
Note that two stations of 20 slots give 40 places for 40 trackers, that is one place per device. This is the simplest rule: there must be at least as many slots as devices, because a device returns to the charger after it is handed back. Only then does every device have a place to charge regardless of the shift pattern.
The slot sizing rule
Start from the number of devices in circulation, not from the number of workers. Add a reserve for devices under service or replacement. Example: 120 devices in circulation and a 10 percent reserve make 132 places, that is five 28-slot stations (140 places). The 10 percent reserve is an example assumption, not a requirement; in a plant with frequent damage, increase it.
If the station has to serve overlapping shifts, check the full charging time. A device returned at 2 p.m. must be charged by 2 p.m. the next day, but when shifts overlap it will be issued after a few hours. Ask the supplier for the charging time and take it into account when placing the stations.
Example: number of 28-slot stations for a fleet
Where to place the station
Below is a breakdown by case, in the order in which they most often appear in real rollouts.
Gate and reception
For trackers issued to drivers and visitors, this is the natural point. A tracker issued to a driver at the gate requires a multi-charger and a return procedure, and a missing return at the gate can trigger an alarm. A station at reception gives control over the return.
Locker room
For devices belonging to the workers themselves, the locker room is the point everyone passes before the shift. A station in the locker room shortens the walk, but requires control over who takes out a device and whether someone takes another person's device.
Tool store
If the plant issues tools for a shift, add the device to the same flow. One person registers the issue and the return, and the station stands under the store camera.
Location requirements
We place the station in a dry room with power, outside explosion-hazard zones, with access limited to authorised persons. Connecting it to an emergency power supply is good practice if issuing devices is part of the evacuation procedure.
Shift pattern and rotation
In a three-shift plant a device goes through three stages in a day: carrying, return and charging, issue. Plan the rotation so that the slots are not empty at issue times. A station full at the start of a shift and nearly empty at its end is a good sign; a station empty before the shift means the devices have not come back.
For larger fleets, rotation per department is a practice from factories and schools, described for watches with a battery: stations are placed at gates and departments, not in one place. This reduces queues and shortens the issue time.
Decision checklist before ordering a station
Before ordering, answer five questions. How many devices are in circulation at the same time? How many shifts overlap at the time of issue? Where is the point that the worker passes before the shift? Is there power and supervision at that point? Who is responsible for the return and for the alarm when a return is missing? If there is no answer to any of these questions, hold the order, because the most expensive mistake is a station placed where workers do not pass.
Checks after rollout
After a month, count how many devices were not issued because of a flat battery, how many went missing and how many needed replacement. If the devices not issued because of a flat battery exceed a few percent, add a station or change the placement. Data from a system that knows the battery state of each device will show this without surveys.
Video
Frequently asked questions
Do we need as many slots as workers?
No. What counts is the number of devices in circulation, because a worker without a device on the shift does not need a slot.
Can cards and watches be mixed in one station?
It depends on the connectors and the station model; settle this with the supplier before ordering.
Does the station need supervision?
It should stand at a point where issue and return are recorded, for example at reception or in the store.
Does InnerWeb sell multi-chargers?
InnerWeb is a software producer. Multi-chargers are bought from suppliers and integrated.
Let's talk about devices at your plant
We will show how to match devices to roles and how the system connects them on one map. Book a conversation with the InnerWeb team.
Let's talk