Location system maintenance: 200 beacons and 2 watches

At an automotive plant the system in operation includes 200 beacons and 2 watches, and maintenance including battery replacement as a service costs about PLN 2,400 net per month. The plant director usually asks what exactly is being paid for and what follows from it for business continuity.

PLN 2,400
monthly maintenance net, including battery replacement
Source: karta
200
beacons in operation
Source: karta
4 years
battery replacement period in the service
Source: karta

Situation: the system works and must be maintained

The automotive plant operates a location system with 200 beacons and two watches. The deployment is behind it, and the question concerns the coming years: who looks after the batteries, who reacts to a faulty beacon, what happens when the layout of the hall changes.

For the director three things matter: a predictable monthly cost, no unexpected system outages and a clear division of responsibility between the plant and the supplier.

What the maintenance service covers

The service covers maintenance together with battery replacement. An industrial-battery beacon works for several years in the range of -40 to 60 degrees Celsius, and within the maintenance service the battery is replaced about every 4 years. With 200 beacons this means a rotation of the order of 50 units a year, spread over time, rather than a one-off action.

InnerWeb is a software manufacturer. The industrial beacon has an industrial design and a CE declaration, while watches are bought and integrated by us. The maintenance service therefore combines oversight of the software with servicing the devices that the plant has in use.

  • battery replacement in beacons according to a schedule
  • response to a report of a non-working beacon
  • oversight of battery state from device heartbeats
  • software updates of the system
  • maintenance of two watches together with their configuration

Devices covered by maintenance

Devices covered by maintenancePie chart: 200 beacons and 2 watches covered by maintenance.Beacons: 200 pcs (99%)Watches: 2 pcs (1%)202pcsBeacons200 pcs (99%)Watches2 pcs (1%)
Source: Deployment card for the automotive plant

Cost and its structure

About PLN 2,400 net per month for the whole comes to about PLN 28,800 per year. Spread over 202 devices, this is about PLN 12 net per month per device. The value is an indicative range from 2025 to 2026 deployments; the individual quotation depends on the number of devices and the site conditions.

For comparison: in the rental model the beacon alone costs about PLN 7 net per piece per month. The maintenance service runs on devices already purchased, so it covers labour, batteries and oversight, not their purchase price.

Why the number of beacons matters so much

The location results from signals of many beacons averaged on the map, indoors at about one beacon per 100 to 200 m2, and it works without GPS. Every beacon that drops out reduces the signal density around it, so gaps should be repaired quickly, before the position starts to blur.

The lead time for installing new beacons is 2 to 10 weeks from the order. That is why, when a hall is extended or the machine layout changes, the plant should report the need in advance, not in the week of launch.

Effect for the plant

The effect visible to the director is a stable, predictable cost and no firefighting. Batteries are replaced according to a plan, faults are reported and fixed in an agreed mode, and the watches remain configured the way they were issued to employees.

Conclusions to carry over to other plants: set a battery replacement schedule at the start of operation, name a person on the plant side who reports faults, and write the response time for a non-working beacon into the maintenance contract.

Video

Frequently asked questions

What does the monthly maintenance of such a system cost?

At the described plant about PLN 2,400 net per month with battery replacement. These are indicative ranges from 2025 to 2026 deployments; the individual quotation applies.

How often are the batteries in the beacons replaced?

In the maintenance service about every 4 years. With 200 beacons this spreads to about 50 units a year.

Does the maintenance cover the watches?

Yes, at the described plant the service covers 200 beacons and 2 watches.

How long do you wait for new beacons?

Installation takes 2 to 10 weeks from the order, so expansion should be reported in advance.