What makes up the cost of a QR label printing workstation
A label printing workstation has four groups of costs: equipment, consumables, people's time and software. Equipment is a label printer with a browser on which the print page runs. Consumables are rolls of labels in the chosen format. People's time is the time of the front office or security. Software is the InnerWeb system function that prepares the list and the print.
InnerWeb is a software vendor, not a maker of readers or access control cards. Labels are printed on a label printer bought and integrated by the plant, and the customer's access control system stays unchanged. The budget therefore does not need to cover replacing readers or cards: that is one of the largest items in classic badge projects.
We do not give fixed prices for rolls or printers, because they depend on the supplier, the volume and the plant's contract. Instead we show how to count consumption, so that once the purchasing department receives the supplier's offer, it is enough to multiply the number of labels by the unit price.
- equipment: label printer and a workstation with a browser
- consumables: rolls of labels in the plant's format
- time: front office or security time spent on printing
- software: print request and print page function in the system
How the label format affects material consumption
The default label format is 86 by 54 mm, and the permitted size range is 13 to 233 mm. The QR code is at least 13 mm regardless of the format. A smaller label uses less material per piece, but it has to hold the code, first name, last name, company and the plant logo in greyscale.
When choosing a format, a plant usually considers three things: readability from a distance of a few dozen centimetres, resistance to dirt, and availability of rolls from the supplier. A small format saves material, but increases the risk that the label is unreadable on the plant floor. The details of choosing a format are covered by other pages in this series.
The label printer driver prints on its own paper format and ignores the page size declared by the web page, so the format is set once at the workstation: paper, zero margins and 100% scale. This is a one-off setup cost, not a recurring cost for each print.
Time to prepare one guest label
Annual calculation step by step
The number of labels in a year is the number of guests per week multiplied by 52. Assuming 40 guests a week, that gives 2 080 labels a year. On top of that comes a reserve for replacements: the plant estimates lost or damaged labels itself, for example by adding a few percent. When a label is replaced, the system issues a new token and the old record stays in the history, so each replacement is one more label in consumption.
The material cost is the number of labels multiplied by the unit price from the roll supplier's offer. The labour cost is the number of labels multiplied by the printing time. When printing from a prepared list, one label takes approx. 20 seconds, and when the badge is prepared by hand, approx. 3 minutes; the difference for 40 guests a week is approx. 1 hour 47 minutes a week.
This hour and minutes figure is multiplied by the hourly rate of the plant's secretariat. We do not assume the rate, because it is an internal figure of the company. The result shows that the labour cost of printing from a list is usually a larger item than the cost of the material itself.
How to calculate the cost of a mass rollout day
On the day of a mass rollout the plant prints a large number of labels in one go. One group invitation covers up to 144 addresses, and the limiter allows 5 invitations per 13 minutes per user. A day with 720 guests is therefore 5 group invitations of 144 addresses each, exactly at the limiter boundary.
The material reserve for such a day is planned in advance: if the plant usually prints a few dozen labels a week, one roll may last for weeks, and on the mass day as many labels will be used as there are guests invited. That is why the purchasing department should know the planned number of guests before it orders the rolls.
It is also worth planning a second print station or a second person, because 720 labels at a single station takes a long time, and the queue for the first label grows during the day.
Example calculation: label consumption and working time for a year
| Parameter | Value |
|---|---|
| Guests a week | 40 people |
| Weeks in a year | 52 weeks |
| Preparing a badge by hand | 3 minutes per person |
| Printing from a prepared list | 20 seconds per person |
| Roll price and hourly rate | from the offer and the plant's data outside the calculation, per the plant's data |
Result: 2 080 labels a year. Time difference: approx. 1 hour 47 minutes a week, that is approx. 92 hours a year (52 times 106.7 minutes). The material cost is 2 080 times the label price from the supplier's offer.
Note: Example calculation. The plant replaces the assumptions (number of guests, handling time) with its own; we do not assume material prices.
Video
Frequently asked questions
Do the costs need to include new readers?
No. InnerWeb does not make or replace readers; it integrates with the existing access control system. The cost covers the label printer, rolls and handling time.
Do you give the price of a label roll?
No, because it depends on the supplier and the volume. We give the way of counting: number of labels times the unit price from the plant's offer.
Is replacing a lost label an extra cost?
Yes, in the form of one additional label and a few dozen seconds of work. There is no need to create a new guest account, because the system issues a new token.
We will count the printing workstation on your data
Bring the number of guests a week and the planned label format. Together we will prepare an annual calculation for your plant.
Let's talk