Who these recommendations are for
The recommendations are aimed at the person who sets up the printing workstation at reception or in the secretariat: the IT administrator, the security manager or an assistant who received the printer in a box. We assume that labels are printed from a browser on a label printer connected to the workstation. InnerWeb is a software producer, so the plant buys the printer and we integrate the printing.
Each recommendation comes with its reasoning, so you can change it deliberately if your printer or roll behaves differently.
Seven recommendations for the print station
The recommendations are ordered in the sequence in which it is worth implementing them: from choosing the format to the acceptance test.
1. Start with the default format of 86 by 54 mm
The default label format in the system is 86 by 54 mm. The permitted size range is 13 to 233 mm. If the plant has no reason to change it, a roll of this size is the simplest, because the label layout is matched to it.
2. Keep at least 13 mm for the code
The QR code is at least 13 mm regardless of the format. For smaller labels, do not shrink the code: shorten the text below it or choose a larger roll. The gate scanner reads the code from a greater distance when it has more pixels per module.
3. Set the paper in the driver once and lock it
The driver prints on its own paper format and ignores the page size declared by the browser. The label design therefore fills the whole format given by the driver. In the driver, set the paper size to match the roll, and in the browser print window: no margins and 100% scale. Do this once at the station and save the settings as defaults.
4. Choose the error correction level deliberately
The QR code according to ISO/IEC 18004 has four error correction levels: L about 7%, M about 15%, Q about 25% and H about 30% of codewords. A higher level requires a larger or denser code. When labels get dirty or scratched, as happens when moving around the hall, level Q or H is recommended; on a clean reception desk a lower level is usually enough.
5. Roll: matt, thermal, one colour
The plant logo is printed in greyscale, so you do not need colour. Thermal labels are cheap to run but fade in sun and heat, so they are not suitable for badges worn for many days in summer. For longer visits, consider a more durable medium.
6. Print from one station
One station with one configuration means fewer surprises than three computers with different drivers. Make the backup station from a copy of the settings, not from scratch.
7. Treat the browser print window as a backup
The print page prints directly on the label printer, and the browser print window is the backup solution. If you use it every day, it is a sign that the connection to the printer needs repair.
Error correction levels of a QR code
Most common mistakes at the print station
The first mistake is fitting the label to an A4 page in the browser settings. The label printer driver does not know this format, so the code lands in a corner or is scaled below readability. The second mistake is changing the roll without changing the paper setting: the label prints shifted and the code runs off the edge.
The third mistake is printing on an office printer with sheet labels. It works in an emergency, but the margins of an office printer cut the edges, and the QR code loses its quiet zone, the empty field around the code that helps the scanner find it. The fourth mistake is testing only with a phone, which forgives more than the gate scanner does.
Acceptance test before the first guest
Print ten test labels and check them with the gate scanner, not a phone. A phone reads almost everything, while the gate scanner can be more demanding. Assess three things: whether the code is complete on the label, whether the text below the code is not cut off, and whether the scanner reads the code on the first attempt.
Repeat the test after every change of driver, roll or browser. It is five minutes of work that saves the first morning with a queue of guests.
- the code complete on the label,
- the text below the code not cut off,
- 10 out of 10 reads with the gate scanner,
- settings saved as defaults.
Video
Frequently asked questions
Why is the QR code cut off even though the label design is correct?
Most often the printer driver uses its own paper format. Set the roll size, no margins and 100% scale in the driver, and the label design will fill the whole format.
Can I shrink the code to fit more text?
Not below 13 mm. Shorten the text or choose a larger roll, because a small code is harder for a scanner to read.
Which error correction level should I choose?
On a clean reception desk a lower level is enough. When badges can get dirty or scratched, Q or H is recommended, at the cost of a larger code.
Do I need a colour printer?
No. The plant logo is printed in greyscale.
Sources
Start the print station without surprises
We will help you choose the label format and set up printing from the browser. Book a call with InnerWeb.
Let's talk