Where the time loss comes from when badges are prepared by hand
When a badge is prepared by hand, the secretariat performs the same steps for every visit: it checks the invitation, enters the data, prints or writes the badge and assembles the documents. Each visit starts the same sequence of steps from the beginning, and their total over a week is considerable.
The time loss does not depend on the action alone. It also comes from the guest waiting at the desk, repeated questions about data and spelling mistakes that have to be corrected. These elements are hard to measure, which is why the calculation below covers only the time of the action itself, and the real saving is usually larger.
The time needed to prepare a badge is a variable for the plant: it is worth measuring it with a stopwatch over a dozen or so visits and entering the plant's own value into the calculation.
How printing from a ready list works
The Print list for the QR code on the guest registration screen shows people with training activity from the last 13 days, with no earlier history and no label printed yet. The secretariat therefore sees whom to prepare before the guests reach the reception.
Once a label is printed, the person disappears from the list, and the list refreshes every 34 seconds. As a result, two people in the secretariat will not print the same label twice, and the list on the screen always shows the current state.
Guest registration at the reception requires first name, last name and phone number, and registration and issuing of the badge are one transaction. As a result no account is created without a code, and the secretariat does not have to check whether every registered person has been given a badge.
Secretariat working time for 40 guests a week
Example calculation for a secretariat week
Assume that preparing a badge by hand takes approx. 3 minutes, and printing a label from a prepared list approx. 20 seconds. With 40 guests a week, manual work is 40 times 3 minutes, that is 120 minutes. Printing from the list is 40 times 20 seconds, that is approx. 13 minutes. The difference is approx. 107 minutes, that is approx. 1 hour 47 minutes a week.
In a yearly scale, over 52 weeks, this is approx. 5 547 minutes, that is approx. 92 hours. If the plant has more guests, the result grows in proportion: with 80 guests a week the difference is approx. 3 hours 33 minutes.
The calculation does not include the time of the person who invites the guest or the time of training, only the action of the secretariat. It also does not assume the cost of an hour of work, because that is an internal figure of the plant.
What to do with the time gained
The hours gained are useful where there were not enough hands before: serving guests who speak another language, checking the completeness of invitations for large groups, and planning mass registration days. On the mass rollout day, with 720 invitations, that is 5 group invitations of 144 addresses each, this reserve is what keeps the queue at the reception under control.
A plant that wants to measure the real effect can compare two weeks: one before the print list is introduced and one after. A single indicator is enough: minutes per guest. The result allows the assumptions in the calculation to be corrected and the purchasing decision to be justified.
Weekly saving with different numbers of guests
Example calculation: secretariat time for badges
| Parameter | Value |
|---|---|
| Guests a week | 40 people |
| Preparing a badge by hand | 3 minutes per person |
| Printing a label from the list | 20 seconds per person |
| Weeks in a year | 52 weeks |
Result: By hand 120 minutes a week, from the list approx. 13 minutes. Saving approx. 107 minutes, that is approx. 1 hour 47 minutes a week and approx. 92 hours a year.
Note: Example calculation. The plant replaces the assumptions (number of guests, handling time) with its own; it does not include the cost of an hour of work.
Video
Frequently asked questions
Does the saving also cover the guest invitation?
No. The calculation covers only the secretariat's action on the label. The time of the inviting person and of the guest is a separate item.
Does the print list show all guests?
It shows people with training activity from the last 13 days, with no earlier history and no printed label. After printing, the person disappears from the list.
How do I measure my own badge preparation time?
With a stopwatch over a dozen or so visits, before and after the print list is introduced. The average of the measurements replaces the assumption of 3 minutes and 20 seconds in the calculation.