Hardware and driver: set it up once
When printing from a browser, the label printer driver uses its own paper format and ignores the page size declared by the web page. That is why the label design fills the whole format set by the driver, and the paper, zero margins and 100% scale are set once at the station. Skipping this step ends with labels that are shifted, cropped or scaled down.
The default label format is 86 by 54 mm, and the permitted dimension range is 13 to 233 mm. Choose the label roll to match the format the plant has selected. Before you open the station to guests, print a few test labels and measure them with a ruler: the QR code must be at least 13 mm, whatever the format.
InnerWeb is a software maker, not a printer maker, so the plant buys the label printer on its own and integrates it with the station. IT installs the driver according to the plant policy and records the settings in the station documentation, so they can be restored after the computer is replaced.
Account, role and access to the print page
The print page, opened by the Print button in the email to the secretariat, is available only after logging in with an administrator or security role. A person without such a role sees the login screen. Before you launch the station, check that the account the secretariat works on has the right role, and run a test from another account without a role: it should be refused.
Print requests will not go out until an administrator sets the secretariat address. By default the field is empty, so the feature is hidden. The address must be either empty or valid, because an incorrect value rejects the save of the whole settings tab.
Every print records who printed a label last and when. It is therefore worth giving each person in the secretariat their own account rather than a shared one, because then the record has audit value.
Label dimensions in the system
Test scanner: check that the print can be read
The scanner works like a keyboard. On a Polish keyboard layout with Caps Lock on, or with the country set to AZERTY, characters and letter case get garbled, so the parser converts the text to lower case and recognises the token with one rule shared by the server and the browser. Even so, test the scanner at the station where it will actually be used, with Caps Lock on and off.
Scan the label printed from the browser with the scanner and with a phone. The public QR code address redirects without checking the token and does not reveal whether the token is valid, so a test on a phone will not tell you whether the badge is active. Activity is decided by the gate, so run a trial at a real gate or in the security panel.
Station handover and documentation
When the tests are finished, record in one place what was set up: the printer model, the driver version, the paper format, the browser, the accounts with their role and the date of the trial. Such a station card shortens recovery after a computer failure, because the next person does not have to rediscover the settings from scratch.
Run a short training session for the secretariat: how to open the print page, how the print list works, what to do with a lost label and whom to contact about a printer problem. When a label is lost, the badge is cancelled and the system issues a new token, so there is no need to create a new guest account.
For a larger rollout, plan a second station or a spare printer. A day of mass registration, where one bulk invitation covers up to 144 addresses and the limiter allows 5 bulk invitations per 13 minutes, can overload a single printer.
Checklist
Video
Frequently asked questions
Why is the label printed shifted?
The driver prints on its own paper format and ignores the page size from the internet. Set the paper, zero margins and 100% scale once at the station.
Who should launch the station: security or IT?
Usually IT installs the driver and the browser, while security checks the role, the test print and the scanner. Both roles tick their points on the same list.
Is a phone enough to test whether a badge is active?
No. The code address does not reveal whether the token is valid. Activity is checked at the gate or in the security panel.
We will launch the station together with your IT
Book a short call with IT and security. We will go through the checklist and set up a test print on your printer.
Let's talk