Why it is worth separating the two groups of modules
The InnerWeb system has 18 modules, but there is no need and no point in running all of them in the pilot. Dividing the modules into those available from day one and those that require hardware lets you plan a pilot that starts producing results in the first week, without waiting for beacon installation.
For the coordinator this is also a tool for talking to management. The first group offers a quick effect with low installation effort, the second is an investment in hardware that is justified only after the first results.
Group one: modules available from day one under the licence
Modules from this group work on the licence alone and do not require a beacon network. The site can switch them on after configuring the instance and issuing user accounts.
- Deliveries: registration and handling of delivery traffic.
- Route patrols: routes and control points carried out in the mobile application, also offline.
- Reports: summaries, including the morning report for the manager.
- Tasks: assigning and settling of work.
- Permissions and qualifications: control of who may perform a given job.
- Faults and events: reports with an assigned person responsible.
How to use this in the pilot
It is best to start with the module that answers the reported problem. If the problem is missed patrols, start with patrols and reports. If delivery queues are the issue, start with deliveries. Every module from the first group can be enabled without replacing anything in the site's infrastructure.
Split of pilot modules by requirement (illustrative count of functions from the map)
Group two: modules that require hardware
Location of people and tools, inactivity detection and traffic analytics rely on the BLE network. Localisation in InnerWeb results from signals of many beacons averaged on the map. Inside buildings we recommend one beacon per 100-200 m2, on site roads roughly every 100 m, and the system works without GPS.
The inactivity detection pilot covers a network of 50 BLE beacons, a server with licences for 10 users and LTE watches with SIM cards managed through MDM. The LTE watch has its own SIM card, so it does not require integration with the site network. This is an example in which the hardware is a condition of the function, but the deployment does not touch the IT infrastructure.
Extending the pilot: is a new licence needed
Extending the pilot with further modules does not require a new licence or a new installation, only possibly additional BLE hardware. This means the first group of modules can be the starting point, and after the results are assessed the site adds beacons and watches without repeating the configuration.
This matters for budget planning: the cost of the next stage is mainly hardware and its maintenance, not a new system installation. Indicative monthly costs of the inactivity detection pilot are about 800 PLN for the server with licences for up to 10 users, about 350 PLN for maintenance of 50 beacons and about 100 PLN for watch rental, all net and indicative.
Modules not to promise in the pilot
Two features require care. The voice assistant is a pilot on a single server enabled by a flag and is not available on every installation. The mRCP module is disabled by default. If users expect them in the pilot, agree this with the vendor at the start to avoid disappointment.
InnerWeb is an independent system that complements the existing systems of the client (access control, time and attendance, HR, ERP), so the pilot does not replace those systems. The modules on the map do not require replacing readers or the time and attendance system.
How to order the start-up
A practical order for the pilot starts with a module from the first group that answers the main problem, and runs until the first review of results. If the results are good and the problem concerns localisation or the safety of people working alone, beacons and watches are added. The next review then assesses the modules from the second group.
This way management sees two stages: the first effects without investment in hardware, and then a justified expansion. This order reduces the risk that the pilot gets stuck on beacon installation before anyone sees a result.
Video
Frequently asked questions
Which modules work without a beacon network?
Deliveries, route patrols, reports, tasks, and permissions and qualifications. They are available from day one under the licence.
What requires BLE hardware?
Location of people and tools, inactivity detection and traffic analytics. They rely on the BLE beacon network, and inside buildings we recommend one beacon per 100-200 m2.
Does extending the pilot require a new licence?
No. Extending with further modules does not require a new licence or a new installation, only possibly additional BLE hardware.
Is the voice assistant part of the pilot?
The voice assistant is a pilot on a single server enabled by a flag and is not available on every installation. The mRCP module is disabled by default.
Let's plan a pilot for your site
Book a conversation with InnerWeb: we will help you select the scope, the number of users and the pilot success criteria for your hall or route.
Let's talk