What makes up the monthly cost
The standstill detection pilot for lone workers covers a network of 50 BLE transmitters, a server with licences for 10 users and LTE watches with SIM cards managed through MDM. Each of these elements has its own line in the monthly costs, so the purchasing department sees what it pays for and what it can change when scaling the pilot up or down.
Sample monthly costs of the pilot look as follows: server with licences for up to 10 users about 800 PLN, maintenance of 50 transmitters about 350 PLN, which gives about 7 PLN per transmitter, and watch rental about 100 PLN including the SIM card and MDM. The amounts are net and indicative; the individual quote depends on scope, the number of watches and the conditions at the plant.
Server and licences
The item of about 800 PLN per month covers the server with licences for up to 10 users. The flexible licence counts Active Users, that is accounts with at least one login in the calendar month, with a minimum of 10 licences in billing. Guests, employees of external contractors and drivers are not counted.
Transmitter maintenance
About 350 PLN per month for 50 transmitters is about 7 PLN per unit. This is the cost of maintaining the network, not its purchase: during the pilot the plant does not finance infrastructure whose usefulness it has not yet assessed.
LTE watches
Watch rental costs about 100 PLN per month including the SIM card and MDM. For the pilot, renting is recommended instead of buying: there is no investment in equipment, and service and replacement are the vendor's responsibility.
What is not a monthly cost
The fee for the commissioning month is not part of the monthly costs: the subscription is charged from the month after commissioning. The pilot may also run without a fixed time limit, so there is no predetermined number of months you pay for. For budget planning, assume a working scope, for example three or six months, and compare it with the cost after a full assessment of the results.
Outside the scope of this calculation are the plant's own costs: coordinator time, training of people wearing watches and any preparatory work at the transmitter mounting points. An LTE watch has its own SIM card, so there is no cost of integration with the plant network, which simplifies the pilot budget.
Sample calculation: monthly cost by number of watches
How to calculate the cost for a different number of watches
The first two items are fixed in the pilot, and the third grows linearly with the number of watches. The formula is simple: 800 PLN plus 350 PLN plus the number of watches times 100 PLN. For five watches this gives 1650 PLN per month, and for ten watches 2150 PLN. This is a sample calculation based on indicative amounts, so treat the result as a starting point for a conversation with the vendor, not as an offer.
The number of watches should follow from the number of people working alone at the same time, not from the total number of employees. If several people work alone in one shift within the area covered by the 50 transmitters, you can limit the pilot to those people and only after the assessment extend it with further watches.
How to compare the cost with the alternative
Compare the cost of the pilot not with zero but with the alternative: buying the full network and the watches before any assessment. A pilot in real conditions confirms operation before the production network is bought, which reduces the investment risk. After the pilot, the devices used in it can be transferred to ownership on a 1:1 basis to avoid a double purchase, provided this option was agreed in the order.
When comparing, remember the option in which the licence and maintenance costs are covered by the external companies using the system, and the cost on the plant side is 0 PLN per month. This is an option on request, available in some installations, and it requires agreement with the external companies.
What to check in the pilot offer
Before signing the order, compare the offer with the list below. Each point should have a written answer, preferably in a table with net amounts.
- Whether the server with licences covers 10 users and what the billing minimum is.
- Whether maintenance of 50 transmitters is counted as a fixed monthly item.
- How much an additional watch with SIM card and MDM costs.
- From when the subscription is charged and what proves commissioning.
- How the replacement of a faulty watch works and what the vendor's service response time is.
- Whether after the pilot the devices can be transferred to ownership on a 1:1 basis.
Sample calculation: standstill pilot with 5 watches
| Parameter | Value |
|---|---|
| Server with licences for up to 10 users | 800 PLN net/month |
| Maintenance of 50 transmitters | 350 PLN net/month |
| Watch rental with SIM and MDM | 100 PLN net/month |
| Number of watches (assumption) | 5 pcs |
Result: 800 + 350 + 5 x 100 = 1650 PLN net per month
Note: Sample calculation based on indicative deployment ranges from 2025-2026; the individual quote applies. The number of watches is an illustrative assumption.
Video
Frequently asked questions
How much does a standstill pilot cost per month?
Indicatively: a server with licences for up to 10 users about 800 PLN, maintenance of 50 transmitters about 350 PLN and watch rental about 100 PLN with SIM card and MDM. Net amounts; the individual quote applies.
Does the cost depend on the number of watches?
Yes, but only one item. The server and transmitters are a fixed cost, while watch rental grows linearly with their number.
Do I pay for the commissioning month?
No. The subscription is charged from the month after commissioning, so the installation month generates no subscription fee.
Does the watch require integration with the plant network?
No. The LTE watch has its own SIM card, so the standstill pilot does not require integration with the plant network.
Can I avoid the monthly cost?
In some installations an option is available in which licence and maintenance costs are covered by external companies, and the cost on the plant side is 0 PLN per month. This is an option on request.
Let's plan a pilot for your plant
Book a conversation with InnerWeb: we will help you select the scope, the number of users and the success indicators of the pilot for your hall or route.
Let's talk