Three typical starting areas
Plants usually consider three starting areas: a production hall, one patrol route, or the gate through which external companies drive and walk in. Each has a different advantage and a different risk, and the choice should not be decided by where the enthusiasm is highest.
A pilot can start from one site with real traffic from external companies, and extending it to other sites should be planned only after the results are assessed. The same rule applies inside the plant: first one area, then the next.
Gate for external companies
Advantage: the traffic is real and daily, and the result is visible in the number of people admitted, the time of the briefing and the completeness of documents. A pilot on delivery traffic confirms how the system works before the production network is bought. Risk: it requires cooperation with security and external companies, not only with the internal team.
Patrol route
Advantage: a small scope and clear measures. The patrol pilot is built on one real route with about 100 transmitters, one transmitter per about 200 m², and it shows its effect already on the first day in the morning report. Risk: the result concerns one team and one shift, so it is easy to overestimate.
Production hall
Advantage: it covers many hazards at once and makes it possible to test positioning in dense buildings. Inside a building 1 transmitter per 100-200 m² is recommended, so the cost grows with the floor area. Risk: a large scope makes it hard to judge what exactly produced the effect.
Criteria for choosing the area
The choice should rest on five criteria. It is worth scoring each area on a scale from 1 to 5 and then comparing the totals. The scale is a tool for conversation, not a mathematical result.
- Real traffic: whether what the system is to handle happens in the area every day.
- Measurability: whether the state before and after the pilot can be measured.
- Start-up cost: how many transmitters, devices and licences are needed.
- Readiness of people: whether the area manager is engaged and the team knows the goal.
- Value for the decision: whether the result will convince the board to move to production.
Recommended floor area per transmitter inside a building
Transmitter location and density in choosing the area
Positioning in InnerWeb is based on signals from several transmitters averaged on the map. Inside a building 1 transmitter per 100-200 m² is recommended, on plant roads about every 100 m, and the system works without GPS. These proportions make it possible to estimate the cost of the network in each of the three areas before the conversation with the vendor.
A large hall needs proportionally more transmitters than a patrol route, which covers selected inspection points. A gate and its access road are a few sections, where the rhythm of placement matters more than the total area. That is why the cost of a pilot at a gate can be lower despite the heavy traffic.
How to sequence the areas
First one area, then the others in a set order. For example, the pilot starts at the gate, because the result is most visible there, then covers a patrol route, and finally the hall. Later areas reuse the configuration, templates and experience of the first one.
This rule is confirmed by the practice of two-site pilots: the next plant after a pilot reuses the configuration, training materials and permit templates from the first, so the cost and time of the second stage are lower.
Checklist
Video
Frequently asked questions
Where should we start: the hall, the route or the gate?
From the area with real traffic that can be measured and where the manager is engaged. Often this is the gate or one patrol route, because the scope is small.
How many transmitters are needed for a route pilot?
A patrol pilot is built on one route with about 100 transmitters, at a ratio of 1 per about 200 m².
Can we run pilots in two areas at the same time?
You can, but the result is harder to judge and the cost rises. It is usually better to start with one area and add the second once the first produces data.