Permit templates in the welding bay for external contractors

The protection coordinator at a machinery plant has two kinds of work in the welding bay: its own and work commissioned to external contractors. For the second kind they need permit templates that lay out the tasks before, during and after the work, with some of them closing by themselves. Below are six recommendations, from the structure of the template to attaching people to the permit.

-62.5%
time to issue a permit (40 to 15 min)
Source: kalkulacja przykładowa
approx. 167 h
per month at 400 permits
Source: kalkulacja przykładowa

For whom and why a template

These recommendations are addressed to the protection coordinator or health and safety manager at a machinery plant where external contractors carry out welding, structural repairs and renovation work. The welding bay is a place with constant hazards, so the permit flow should be repeatable, not invented each time.

The permit flow, meaning the preparatory, main and closing tasks and the automatic closing, follows the template linked to the location. The template is configured in the installation data, without any change to the code. This means the coordinator can improve it after a review without waiting for a programmer.

Six recommendations for templates in the welding bay

The recommendations concern the order of tasks and the places where an external contractor most often gets lost in the procedure.

1. Separate the three phases of tasks

Preparatory, main and closing tasks should be separate groups. Preparation means checking the place and the means, the main phase is the welding itself, and closing means tidying up and inspection after the work. This way the contractor knows which phase they are in.

2. Treat PSZN tasks as part of the flow, not an add-on

When the permit starts, open PSZN tasks move from the preparation phase to the main work, and there the contractor or the administrator confirms them. The template should provide for this, so that confirmations do not hang without an owner.

3. Remember that the PSZN and the permit status are independent

The business decision is that the PSZN and the permit status are not linked to each other, and unclosed PSZN tasks do not block the permit from moving from preparation to main work or to completion. The template therefore cannot assume that the permit will not move without a closed PSZN. The closing check sits within the PSZN work itself.

4. Close automatically what can be verified

A task whose completion follows from another event should close by itself. The template lets you define which tasks close automatically. Manually ticking closing tasks ends with someone marking them all in one go at the end of the shift.

5. Use attaching people to the permit by location

Once the location is recognised, the system can attach a worker to the permit at the work place and detach them when they leave, so the working time follows the location, not a declaration. For external contractors in the welding bay this matters, because the list of people on the permit matches reality.

6. Make sure the PSZN work is closed

PSZN work cannot be closed while more than one person remains on site. The template should have a closing task that reminds the team to leave the place before the coordinator tries to end the work.

Time to issue a permit: paper versus digital template

Time to issue a permit: paper versus digital templateBefore and after chart: issuing a permit on paper takes 40 minutes, and from a digital template 15 minutes010203040minPaper: Issuing a permit: 40 min40 minPaperDigital template: Issuing a permit: 15 min15 minDigital template
Source: Example calculation based on the assumptions in the time saving section

A permit covering several welding stations

The welding bay rarely has a single station. A permit covering several locations is drawn on the map as one outline of the whole work area, not as a single point. For the protection coordinator this means one document and one reach on the map instead of several separate permits.

In the template it is worth providing for additional locations, which the system takes into account in the risks on the printout. This way the scope of the work on paper and on the map is the same.

A change of contractor or location should not break the template

When working with several external contractors, it happens that the issuer changes the contractor after half the form is filled in. Changing the contractor company clears only the workers, the team leader and the template, while changing the location clears the additional locations and the template.

The practical conclusion for the coordinator: template names should clearly indicate the location, so that after a change the issuer knows which template to select again.

  • The template name includes the welding bay area and the type of work.
  • The template for an external contractor is distinct from the template for the plant's own work.
  • Template reviews after every incident or change of procedure.

How much time a template saves: an example calculation

For example, issuing a paper permit takes 40 minutes, and a digital permit from a template takes 15 minutes. At 400 permits a month the difference is 25 minutes per permit, which is 10,000 minutes a month, or about 167 hours of work.

These are stated assumptions of an example calculation, not a measurement result from a specific plant. The actual time depends on the number of tasks in the template and the experience of the issuer, which is why it is worth measuring it on your own permits during the pilot.

Video

Frequently asked questions

Does the template have to be changed in the system code?

No. The template is linked to a location and configured in the installation data, without any change to the code.

Will an unclosed PSZN task stop the permit?

No. Such tasks do not block the permit from moving from preparation to main work or to completion.

What happens after the contractor company is changed in the form?

The system clears the workers, the team leader and the template. The locations remain.