Multi-location permit: work area outline on the map

A permit covering several locations is drawn on the map as one outline of the whole work area, not as a single point. The guide shows the permit issuer how to add additional locations in the wizard, what to avoid when changing the main location and how to check the outline before saving.

5
risk sections on the permit printout
Source: card
7
steps of the permit wizard
Source: card

Why an outline instead of a point

An assembly line or a row of workstations is not a single point. When a permit indicates only the main location, the map shows a point, and the other workstations covered by the work remain invisible to the dispatcher and to people entering the zone. Such a picture does not reflect the real reach of the work, for example welding along a line.

A permit with additional locations is drawn as one outline of the whole work area. The online map shows the plant in an isometric 2.5D view with buildings, vehicles, workers and places of work, so the outline is visible at once against the hall. For the shift supervisor this means one glance instead of checking a list of locations.

How to add additional locations in the wizard

The permit issuer adds additional locations in the permit wizard. First select the main location, then attach the further workstations or areas covered by the work. The wizard guides the user through seven steps, from basic data to the summary.

  • Select the main location of the work.
  • Add additional locations: the remaining workstations or sections of the line.
  • Check on the map whether the outline covers the whole work area.
  • Move on to the next steps: high-risk work, tasks, risks, team.
  • Before saving, check the printout preview.

Locations covered by one permit in three examples

Locations covered by one permit in three examplesBar chart: a permit for one workstation covers 1 location, for a row of 4 workstations 4 locations, and for a line of 8 workstations 8 locations02468pcsOne workstation: 1 pcs1 pcsOne workstationRow of 4 workstations: 4 pcs4 pcsRow of 4 workstationsLine of 8 workstations: 8 pcs8 pcsLine of 8 workstations
Source: Sample calculation: main location plus additional locations

The trap: changing the location clears the additional locations

Changing the location in the wizard clears the additional locations and the template. This is a safeguard against inconsistency, because the permit template is linked to the location, and additional places matched to the previous main location may not fit the new one. The practical effect, however, is that an issuer who changes the main location in the middle of the work has to add the additional locations again.

That is why the order of steps matters: choose the main location first and do not change it after adding the others. If the change is necessary, plan to add the additional locations again and to select the template.

The outline, the risks and the template

Risks with the required protective measures are assigned to locations at every level of the hierarchy: hall, area, line, place. The permit printout presents them in five sections without repetition: inter-permit risks, the location hierarchy, additional locations, the high-risk work type and user risks. When you add additional locations, you therefore also add their risks to the printout.

The course of a permit follows the template linked to the location, and templates are configured in the installation data, without changes to the code. For a permit covering several locations, check that the selected template fits the whole work area, not only the main location.

Checking before saving and audit evidence

Before saving, the wizard shows a preview of the printout from the plant's matrix and a preview of the e-mail for each recipient, and the server calculates the expected permit status. This is a good moment to check whether the risks of all additional locations appear on the printout.

In the concept for a machine plant, where assembly lines are drawn on the isometric map of the hall, the outline helps the dispatcher assess the reach of the work. We describe this as an implementation scenario. The printout and the picture on the map are the audit evidence of which area was covered by the permit.

Checklist

Video

Frequently asked questions

Does a permit for one workstation also have an outline?

The outline applies to permits covering several locations. A permit for one workstation is shown through its main location.

What happens to the additional locations when the main location changes?

They are cleared together with the template, so they must be added again. That is why the main location is chosen at the start.

Do the risks of additional locations appear on the printout?

Yes. The permit printout has a separate section for additional locations and combines the risks without repetition.

Let us see the outline on your assembly line

In a demo we will show how a permit covering several locations becomes an outline on the hall map. We welcome a conversation.