Assumptions of the calculation and why they are only examples
The calculation rests on three assumptions: issuing a paper permit takes 40 minutes, issuing a permit in the wizard takes 15 minutes, and the plant issues 400 permits a month. These are example values, not the result of a measurement in a specific plant and not a declared effect for any client.
They should be treated as a template for your own calculation. Before a conversation about implementation, a plant can measure over one week how long issuing a permit really takes, and put its own figures into the same formula. The result will then be more reliable than any value quoted from outside.
The monthly result, step by step
On paper, 400 permits at 40 minutes each is 16,000 minutes, or about 267 hours of work in a month. In the wizard, 400 permits at 15 minutes each is 6,000 minutes, or 100 hours. The difference is 10,000 minutes, or about 167 hours a month, which means a 62.5% reduction in the time spent issuing permits.
Assuming an 8-hour working day, this corresponds to about 21 working days of one person per month. This does not mean a reduction of posts: the freed-up time usually goes back to rounds, inspections and planned work, which in a paper workflow is postponed.
Monthly time to issue 400 permits
Where the time saving in the wizard comes from
The wizard for a new permit has seven steps: basic data, high-risk work, tasks, risks, team, notifications and summary. The order guides the person issuing the permit through a complete set of data, so they do not have to remember what is still missing from the paper form.
Before saving, the wizard shows a preview of the printout from the plant's matrix and a preview of the e-mail for each recipient, and the server calculates the expected permit status. This reduces the number of corrections after the fact. A started form is saved locally as a draft assigned to the user, so interrupted work survives closing the browser tab.
- Seven steps guide the user through a complete set of data.
- The printout and e-mail previews reduce corrections after the fact.
- The draft is saved locally and survives closing the tab.
- Work type tiles are sorted by how often the issuer uses them.
What the calculation does not include
The calculation counts only the time of issuing permits. It does not include the time of approval by the coordinator, the execution of the work, archiving of paper documents or the cost of printing. It also assumes nothing about implementation time, training of issuers or configuration of templates.
Changing the contractor in the wizard clears the employees, the team leader and the template, and changing the location clears additional locations and the template. This is a safeguard against mistakes, but it means that when changes are made mid-way through filling in, the issuer repeats some steps, which in real time is a small item, not a saving.
Permit issuing time: paper vs wizard
| Parameter | Value |
|---|---|
| Permits issued per month | 400 permits/month |
| Issuing time on paper | 40 min |
| Issuing time in the wizard | 15 min |
Result: Paper: 16,000 min (about 267 h); wizard: 6,000 min (100 h); difference: 10,000 min (about 167 h), i.e. -62.5%
Note: Sample calculation based on assumptions, not the result of a measurement in a specific plant. The plant should substitute its own issuing times and its own number of permits.
Video
Frequently asked questions
Are 40 and 15 minutes values measured at a client?
No. They are explicit assumptions of the sample calculation. The plant should measure its own times and put them into the same formula.
Does the calculation include the cost of implementation?
No. It counts only the time of issuing permits. Implementation pricing is individual and depends on the scope.
What happens to a started permit when the browser closes?
The form is saved locally as a draft assigned to the user, so interrupted work survives closing the browser tab.
Does the wizard show what the printout will look like?
Yes. Before saving it shows a preview of the printout from the plant's matrix and a preview of the e-mail for each recipient.
Let us put your figures into the calculation
We will measure together the time of issuing permits in your plant and count the result on your own data. We welcome a conversation about a demo of the wizard.
Let's talk