Mould change permit template: a step-by-step guide

A mould change on an injection machine looks much the same every time, so the permit for it should not be written from scratch. We show how to build a template made of tasks, risks and a team, which the shift manager selects in the new permit wizard, and how to check that the template works before it reaches the hall.

7
steps of the new permit wizard
Source: karta
5
risk sections on the printout
Source: karta

What the template is for and who creates it

The task template is selected for the location and the contractor's company. It is a ready set of actions that the shift manager receives in the wizard after indicating the hall or line and the company that will carry out the work. Tasks from the template can be edited only for the current permit, so a one-off change does not spoil the pattern.

The template is usually created by the OHS specialist together with the maintenance manager, because the latter knows the sequence of actions in a mould change and the former knows which of them require safeguarding. The result can be saved as a new template if the experience from a specific change should become part of the pattern.

Step 1: set the scope and location

Decide whether the template covers all machines in the hall or a single line. Risks in the system are assigned according to the hierarchy: hall, area, line, location. A template for a line with a press of high clamping force should be separate from one for small electric machines.

Record in the template description which type of change it is meant for: a standard mould change, a change of a mould with a hot runner system, or a change involving removal of sensors. The description will save questions later, when there are a dozen templates.

Seven wizard steps and the steps the template touches

Seven wizard steps and the steps the template touchesWizard step numbers: tasks 3, risks 4, team 5, notifications 6, summary 7.02468stepTasksTasks: 3 step3RisksRisks: 4 step4TeamTeam: 5 step5NotificationsNotifications: 6 step6SummarySummary: 7 step7
Source: Step numbering of the new permit wizard from the feature documentation

Step 2: list the tasks in the order of work

Arrange the tasks in the order in which they are carried out on the floor: stopping the machine, cutting power and securing it, emptying and cooling the barrel, disconnecting cooling and hydraulic media, lifting the mould off with a crane, fitting the new mould, trial run and release of the machine.

When the permit starts, open hazardous work tasks move from preparation to the main works, where they are confirmed by the contractor or the administrator. If the change involves hot work, the securing task should be assigned to that work type.

Step 3: select the risks

The system assembles the risks on the permit printout in five sections with deduplication, so you do not need to duplicate in the template the risks already assigned to the hall or line. Make sure that risks specific to a mould change, for example being trapped in the clamping zone, crushing by the mould and burns from a hot surface, are available in the catalogue.

If a risk is missing, an administrator or OHS specialist adds it once in the risk editor, and it is then selectable for all issuers. Remember that after protective measures usually only the probability drops; the risk level thresholds are 20, 70, 200 and 400.

Step 4: set the team and notifications

The mould change team is usually a setter, a mechanic and the machine operator, sometimes additionally a crane operator. Enter roles, not people: the shift manager will name the specific people when creating the permit. The system then checks whether the assigned workers hold valid qualifications, medical examinations and training.

The wizard has seven steps: basic data, hazardous work, tasks, risks, team, notifications and summary. The template affects tasks, risks and the team; notifications are described in the permit notifications checklist.

Step 5: check the template in the summary

The wizard summary shows the expected permit status calculated on the server, together with a print preview from the plant's matrix before the permit is created. Run a trial permit on the template and compare the printout with what the shift manager has in mind.

Ask two shift managers from different shifts whether they understand every task without asking questions. A started version of the form is saved in the browser, so you can pause the trial and return to it after a page refresh.

Checklist

Video

Frequently asked questions

Does changing tasks in one permit change the template?

No. Tasks from the template can be edited only for the current permit. If the change is meant to be permanent, the result is saved as a new template.

What about a permit that was not finished?

A started version of the form is saved in the browser, so an unfinished permit survives a page refresh.

Who should create the template?

Ideally the OHS specialist together with the maintenance manager. The first knows the safety requirements, the second the sequence of actions in a mould change.