InnerWeb
Skip to main content

Cost of mould change permits: a calculation for 20 injection machines

Mould changes and machine service are repeatable tasks in an injection plant, so every permit written from scratch wastes time that can be counted. We show a sample calculation for a plant with 20 injection machines, three shifts and eight mould changes a week, with assumptions that anyone can replace with their own data.

104 h
yearly saving in the sample calculation
Source: kalkulacja przykładowa
12
permits a week covered by the template
Source: kalkulacja przykładowa
10 min
saving per permit (assumption)
Source: kalkulacja przykładowa

Where the time loss in mould change permits comes from

The loss does not come from one long permit but from hundreds of short ones, each filled in from the start. For every mould change the tasks must be specified, the risks selected and the team set up. The shift manager does this from memory, and that memory differs from shift to shift.

The task template is selected for the location and the contractor's company. Tasks from the template can be edited only for the current permit, and the result can be saved as a new template, so the knowledge from the first change pays off with every subsequent one.

Calculation assumptions

The calculation assumes an injection plant with 20 injection machines, working three shifts, and 8 mould changes a week. We additionally assume 4 service permits a week and a saving of 10 minutes per permit once the template is introduced.

Other assumptions: the plant works 52 weeks a year, and the hourly rate of the person issuing the permit is 100 PLN gross to the employer. The rate is a contractual value to be converted into money, and each plant substitutes its own. The 10-minute saving is an assumption, not a measured result: the plant should measure the time to issue a permit before the template and after it.

Yearly time saving by permit type

Yearly time saving by permit typeBars: mould changes 69 hours, machine service 35 hours, total 104 hours a year.0255075100125hoursMould changes: 69 hours69 hoursMould changesMachine service: 35 hours35 hoursMachine serviceTotal: 104 hours104 hoursTotal
Source: Sample calculation based on the assumptions in the Calculation assumptions section

Result: hours per year

Mould changes: 8 permits a week times 10 minutes gives 80 minutes a week, or about 69 hours a year. Service permits: 4 a week times 10 minutes gives 40 minutes a week, or about 35 hours a year.

In total 12 permits a week, 120 minutes a week, 104 hours a year. At 100 PLN an hour this gives about 10,400 PLN a year. The amount does not include what is harder to count: fewer omitted risks and a consistent team composition on every shift.

What the template rollout itself costs

The cost of implementation consists of the work on the templates (tasks, risks, team for a mould change and for typical services) and a short training for shift managers. Pricing is individual and depends on the number of locations, types of work and integrations; we state only that this is work measured in days, not months.

The calculation should also include the time of the OHS specialist, who describes the risks once. After a missing risk is added in the editor, it is selectable for all issuers, so there is no need to add it again for every permit.

What the calculation does not cover, and how to verify it

The calculation does not cover changes in the number of mould changes, shorter downtime, or the costs of incidents that were avoided. It also does not cover the cost of a started but unfinished form: the started version is saved in the browser, so an unfinished permit survives a page refresh and does not have to be started again.

The safest way to verify the result is on one hall over four weeks. Measure the average time to issue a mould change permit before the template is introduced, then after it, and substitute your own difference instead of 10 minutes.

When a template stops paying off

A template loses its sense when typical jobs differ so much that each requires different tasks, for example in a plant with short runs and a very varied mould park. Then it is better to build several smaller templates than one universal one.

In a plant with repeatable runs, a template built in the wizard, where the summary shows the expected status calculated on the server together with a print preview, reduces errors in the last step. This is an additional benefit that we do not count in hours.

How to transfer the result to your own injection plant

Enter your own figures in three places: the number of mould changes a week, the number of service permits, and the measured time saved on one permit. The formula is simple: permits per week times minutes saved times 52, divided by 60.

For example, with 15 permits a week and 8 minutes saved, the result is 104 hours a year, the same as in the base calculation, but reached with different values. It is therefore worth looking at the product, not at a single parameter.

Example calculation

Sample calculation: permit template in an injection plant

Assumptions
ParameterValue
Number of injection machines20 machines
Mould changes8 a week
Service permits4 a week
Saving per permit10 minutes
Weeks in a year52 weeks
Contractual rate100 PLN/h

Result: 12 permits a week x 10 minutes x 52 weeks = 6,240 minutes, or 104 hours a year, about 10,400 PLN at the contractual rate.

Note: Sample calculation based on contractual assumptions. The actual result depends on the plant and requires measuring the time before and after the rollout.

Video

Frequently asked questions

Are the 10 minutes of saving a measured value?

No, it is an assumption for the calculation. The plant should measure the time to issue a permit before the template and after it, and then substitute its own difference.

Can the template be changed for a single permit?

Yes. Tasks from the template can be edited only for the current permit, and the result can be saved as a new template if the change is meant to be repeatable.

Does the calculation include the licence cost?

No. The calculation shows the time-saving side. The implementation quote is individual and depends on the number of locations and integrations.

Let us calculate it on your injection plant's data

Enter your own number of machines, changes and permit issuing time. We will prepare a calculation based on your assumptions.

Let's talk