InnerWeb
Skip to main content

Lease or buy LTE watches in a no-movement pilot

A safety manager launching a lone worker pilot with no fixed end date has to decide whether to lease or buy LTE watches. The recommendations below rest on the pilot kit: 50 transmitters, a server with 10 licences and watches with SIM cards.

approx. 100 PLN
monthly lease of a watch with SIM and MDM (net, indicative)
Source: card
approx. 7 PLN
monthly upkeep of one transmitter (net, indicative)
Source: card

Who these recommendations are for

The recommendations apply to plants that want to test no-movement detection for lone workers: people working in boiler houses, warehouses, switchgear rooms or on yards, where nobody sees that a worker has stopped moving. The pilot is meant to show whether the system works in real conditions before the plant decides on scale.

The choice of watch arrangement looks minor, but it affects the budget, the schedule and responsibility for the equipment. That is why it is worth making the choice deliberately, before the first device is ordered.

The no-movement pilot kit

The pilot of no-movement detection for lone workers includes a network of 50 BLE transmitters, a server with licences for 10 users and LTE watches with SIM cards managed through MDM. The LTE watch has its own SIM card, so the pilot does not require integration with the plant's network. This lowers the entry barrier, because the IT department does not have to share the wireless network or open ports for new devices.

Sample monthly costs of the no-movement pilot (net)

Sample monthly costs of the no-movement pilot (net)Horizontal bar chart: 800 PLN for the server with licences, 350 PLN for transmitters, 100 PLN for a watch.0200400600800PLNServer and 10 licencesServer and 10 licences: 800 PLN80050 transmitters50 transmitters: 350 PLN3501 watch with SIM and MDM1 watch with SIM and MDM: 100 PLN100
Source: Sample calculation, indicative ranges from 2025-2026 deployments; individual quote

Seven recommendations

The recommendations below are ordered from the most important. Each comes with a short justification.

1. Lease the watches in the pilot

For the pilot, leasing watches is recommended instead of buying them. Without an investment in equipment, the pilot result is not burdened with a cost that cannot be recovered. Servicing and replacement are handled by the vendor.

2. Do not tie the decision to a deadline

The pilot can run without a time limit. This makes it possible to assess the system in real conditions, including the season, night shifts and idle periods, and only then decide on scaling. The subscription is counted from the month after launch, so no cost is incurred during preparation.

3. Plan the monthly cost, not only the start

Sample monthly costs of the no-movement pilot are: a server with licences for up to 10 users at about 800 PLN, upkeep of 50 transmitters at about 350 PLN (about 7 PLN per transmitter) and a watch lease at about 100 PLN, including the SIM card and MDM. The amounts are net and indicative. With several watches the monthly cost grows linearly, so the pilot should cover only as many people as are really needed for the assessment.

4. Choose the pilot group deliberately

Watches should go to lone workers from different shifts and areas. If the pilot covers only the day shift in one hall, the plant will not learn how the system behaves at night or on the yard.

5. Prepare the IT department for a minimum

Because the watch uses its own SIM card, the requirements placed on IT are small. The IT team should still know where the server is and who manages the devices through MDM. A separate page for the IT department describes the details.

6. Decide what happens after the pilot

Before the start, record when the lease turns into a purchase or a production agreement. The lease should not run forever if the result is good. It is enough to set criteria, for example the number of correctly detected events and no false alarms over a defined period.

7. Keep the purchase option open

When the pilot moves to production, the plant can switch to buying the watches. Leasing at the start does not close that route, and it allows the expense to be postponed until the pilot data justify it.

Comparison: leasing and buying in the pilot

Leasing has a low entry cost, servicing handled by the vendor and no risk that the equipment turns out to be unnecessary. Buying makes sense only once the plant knows how many watches it needs and how long they will be in use. In a pilot without an end date that knowledge is only being built, so leasing is the natural starting point.

An additional argument concerns replacement. A watch damaged on a construction site or in a boiler house is replaced by the vendor under the leasing model. Under the purchase model the plant organises the repair or replacement, which takes the team's attention away from assessing the system itself during the pilot.

Video

Frequently asked questions

In the pilot, is it better to lease the watches or buy them?

Leasing is recommended. It needs no investment in equipment, and servicing and replacement are handled by the vendor. Buying makes sense only after the results are assessed.

Does the pilot have an end date?

It does not have to. It can run without a time limit so that the system can be assessed in real conditions. The subscription is counted from the month after launch.

How much does the no-movement pilot cost per month?

Indicatively: a server with licences for up to 10 users about 800 PLN, 50 transmitters about 350 PLN, a watch about 100 PLN. Amounts are net; individual quote.

Do the watches need access to the plant's network?

No. The LTE watch has its own SIM card, so the no-movement pilot does not require integration with the plant's network.

Plan a no-movement pilot

Tell us how many lone workers you want to cover with the pilot. We will prepare the kit and an indicative quote with leased watches.

Let's talk