Pilot without a time limit: purchasing questions

A pilot with no fixed end date looks attractive to the technical team, but the purchasing department has to ask three things: when the subscription starts, what exactly the start includes and how the exit works. Below is a set of questions to put to the vendor before the order goes for signature.

Why a pilot without an end date needs purchasing questions

A pilot without a fixed term lets the site assess the system under real operating conditions, not in a short demo. In the InnerWeb model the pilot can run with no time limit, so the plant tests the system through a full work cycle rather than through two weeks picked from the calendar. For purchasing this means the usual lever, the end date of a trial contract, does not exist and has to be replaced with other safeguards.

The key distinction is this: no time limit does not mean no conditions. Agree what is a fixed cost, what is one-off, when charging starts and which event ends the pilot. From a purchasing point of view a good pilot has a defined start, measurable success criteria and an agreed closing procedure, even if the calendar stays flexible.

Subscription and start: when you start paying

The first question concerns the moment charging begins. In the InnerWeb model the subscription starts from the month following go-live. This means the month in which the system is installed and configured does not generate a subscription fee. Ask the vendor how it defines go-live: is it the day of the first login, the day user accounts are issued, or the day the beacons are mounted and accepted?

The second question concerns what the start covers. For the no-movement pilot this includes a network of 50 BLE beacons, a server with licences for 10 users and LTE watches with SIM cards managed through an MDM system. For the route-patrol pilot the base is one real route, about 100 beacons, three mobile devices and an instance with 10 licences. Ask for a breakdown in table form: item, quantity, one-off cost, monthly cost.

Questions about the start

Before signing, get written answers to a few questions that structure the start of the pilot.

  • When does the vendor consider go-live to happen and what is the evidence of it?
  • Is the month of installation free of subscription fees?
  • Who is responsible for mounting the beacons and configuring the instance?
  • How many users does the starter licence cover?

Monthly cost items of the no-movement pilot

Monthly cost items of the no-movement pilotBar chart: server with licences 800 PLN, maintenance of 50 beacons 350 PLN, rental of one watch 100 PLN per month.0200400600800PLN net/mo.Server and licences (up to 10 users): 800 PLN net/mo.800Server and licences (up to10 users)Maintenance of 50 beacons: 350 PLN net/mo.350Maintenance of 50 beaconsRental of 1 watch with SIM and MDM: 100 PLN net/mo.100Rental of 1 watch with SIMand MDM
Source: Card: indicative monthly costs of the no-movement pilot, net amounts, indicative

Licences in the pilot: who counts towards the subscription

The flexible licence counts Active Users. An Active User is an account with at least one login in a calendar month, and a minimum of 10 licences applies to billing. For purchasing this is important: you do not pay for accounts that nobody opened in a given month, but there is a minimum threshold.

The count includes client employees with administrator, security and health and safety roles, and coordinators from external contractors. Visitors, contractor employees and drivers are not included. A person who only invites guests and contractor firms is not an Active User. Ask the vendor how it counts users and request an example billing for your role structure.

Equipment: rent or buy

For the pilot we recommend renting watches instead of buying them. The site does not invest in hardware, and service and replacement remain with the vendor. For purchasing this is usually the simpler route: a monthly cost instead of a capital outlay that has to be justified to the board before the pilot results are known.

Ask about the terms for replacing a damaged device, the service response time and what happens to the hardware when the pilot ends. If you plan to move to production, ask whether the devices used in the pilot can be transferred to ownership on a one-to-one basis, so that you do not pay for them twice.

Exiting the pilot: what options you have

No end date cannot mean no exit. Ask for a description of three paths: moving to production deployment, extending the pilot to another area, and closing it without deployment. For each path, set the subscription notice period, the rules for returning rented hardware and the fate of the data collected during the pilot.

In past InnerWeb projects, the move from pilot to production deployment reached 100%. This is a fact about past projects, not a promise for your site, so it is still worth recording the success criteria before the start. A shared list of success indicators protects both sides and turns an open-ended pilot into a controlled decision process.

Option with costs borne by external contractors

Some installations have an option in which licence and maintenance costs are covered by the external contractors using the system, so the site's own monthly cost is 0 PLN. This is an option available on request, not a standard, and it requires separate agreement with the contractors. Purchasing should assess whether such a model is acceptable in its relations with contractors and how it affects system availability if one of the firms withdraws.

Video

Frequently asked questions

Does a pilot without a time limit mean there is no contract?

No. No fixed term means the pilot does not end automatically on a set date. You should still record the scope, the subscription, the success criteria and the closing conditions, so both sides know when the pilot turns into a decision.

When does the subscription start?

In the InnerWeb model, from the month following go-live. The installation month therefore does not generate a subscription fee. Ask the vendor for the definition of go-live and have it written into the order.

Is it better to rent or buy watches in the pilot?

For the pilot we recommend renting: no investment in hardware, and service and replacement are the vendor's responsibility. Buying makes sense only after moving to production deployment.

Who counts towards the licences in the pilot?

An Active User is an account with at least one login in a calendar month, with a minimum of 10 licences in billing. Visitors, contractor employees and drivers are not counted.

Can the site avoid paying for the system during the pilot?

Some installations have an option in which licence and maintenance costs are covered by the external contractors using the system, so the site's own cost is 0 PLN per month. This is an option available on request.