Why this transition needs a plan
A pilot is cheaper than a production deployment, but only if its elements are not single-use. A plant that buys transmitters and locators twice, first for the pilot and then for production, pays twice for the same equipment. The transition plan is meant to prevent this.
In past InnerWeb projects the transition from pilot to production deployment reached 100%, so the transition plan is not an emergency scenario but a regular next stage of the pilot. A well-prepared plan shortens the time between the board's decision and production work.
Devices on a 1:1 basis
After the pilot, the devices used in it can be transferred to ownership on a 1:1 basis to avoid a double purchase. This means that every transmitter, locator or watch from the pilot stays at the plant as part of the production installation, and the production order covers only the missing units.
This also applies to pilot equipment used in delivery traffic, which confirms how the system works before the production network is bought. The purchase and installation of the transmitter network, driver locators, charging stations and the subscription follow the decision, not precede it.
What exactly transfers to ownership
The scope of the transfer should be recorded in the contract: the list of devices, their number, the method of handover and the moment ownership passes. The integrator should check that the list matches what is actually on the plant's site.
Leasing in the pilot and ownership
If part of the equipment, for example the watches, was leased during the pilot, buying it after the pilot is a separate decision. Leasing does not close the route to a purchase, but it does not force one either.
Sample equipment purchase: with a double purchase and on a 1:1 basis (pilot kit 50 transmitters, production 100)
Server, data and configuration
Beyond the devices, the configuration and the data collected in the pilot matter. Extending the pilot with further modules does not require a new licence or a new installation, only possibly an addition of BLE equipment. This means the existing instance can grow, and the configuration does not have to be built from scratch.
The module map of the pilot falls into two groups: modules available at once within the licence (deliveries, patrols, reports, tasks, reporting, permissions and qualifications) and modules that require equipment (geolocation of people and tools, no-movement detection, traffic analytics on the BLE network). The move to production usually means enabling further modules from the second group after the plant has been equipped.
For a plant with several sites, the next site after the pilot reuses the configuration, training materials and permit templates from the first. The move to production in one place is then also the preparation for the second.
Transition stages and typical pitfalls
The move from pilot to production can be organised in five stages. Each should have an owner on the plant side and on the integrator side.
- A board decision based on the decision documentation built from the pilot data.
- An inventory of the pilot devices and a decision on what transfers to ownership on a 1:1 basis.
- Calculation of the missing units and of the network extension, using the proportions: roads every 100 m, buildings 1 transmitter per 100-200 m².
- A production order covering only the difference, plus the subscription.
- Enabling further modules and training the users.
Pitfalls for the purchasing department
The most common pitfall is ordering the full network without taking the pilot devices into account. The second is leaving the subscription out of the calculation: a production network is not only a purchase but also a monthly cost. The third is assuming that a module will work on every installation. The voice assistant is a pilot on one server, and the mRCP module is disabled by default, so using them requires a separate arrangement.
Pitfalls for the integrator
The integrator should remember that InnerWeb complements the client's existing systems (access control, RCP, HR, ERP) and does not replace them. The move to production should not change this principle. Integrations with other systems are planned after the pilot is assessed.
Video
Frequently asked questions
After the pilot, do we have to buy the equipment again?
No. Devices used in the pilot can be transferred to ownership on a 1:1 basis, to avoid a double purchase. The production order covers the missing units.
Does extending the modules require a new installation?
No. Extending the pilot with further modules does not require a new licence or a new installation, only possibly an addition of BLE equipment.
Will every module be available after the move to production?
Not every one. The voice assistant is a pilot on one server, enabled by a flag, and the mRCP module is disabled by default. The scope is set with the vendor.
Plan the move to production
Send us the inventory of pilot devices. We will calculate the missing units and set up an order without a double purchase.