InnerWeb
Skip to main content

LoRa watch: range and position reporting every 20 seconds

A watch on LoRa connectivity works without Wi-Fi, but every question about the reporting frequency runs into the physics of the 868 MHz band. Below are the answers to the questions a radio integrator asks most often at the request-for-quotation stage.

20 s
position refresh in the LoRa variant
Source: karta
868 MHz
band with airtime limits
Source: karta

How the position reaches the platform in the LoRa variant

In the LoRa watch variant the position from the BLE beacons is sent by LoRa radio through mesh receivers to a gateway in the organisation's network. The location refreshes about every 20 s, and when an alarm is raised all positions are refreshed.

It is worth distinguishing two levels. The watch hears the BLE beacons in its surroundings, and LoRa is only the channel by which the result travels further. Thanks to this the device needs neither Wi-Fi nor a SIM card, and the radio network can be private and belong to the site.

This is a development solution, not a series product. Active LoRa cards can power the stillness mechanism with pulses, and the watch sleeps between pulses. We treat them as an option to be agreed in the request, not as a ready catalogue position.

Questions about reporting frequency

Most questions concern whether 20 seconds is a value the network can sustain for the whole workforce.

Will a LoRaWAN network sustain a report every 20 seconds from every device?

Not at the scale of the whole workforce. Cyclic reporting every 20 s exceeds the capacity of a LoRaWAN network and the airtime limits in the 868 MHz band. The network gets congested and the batteries last only a few days. That is why the 20 s rate in the described variant is intended for an architecture with mesh receivers and an own gateway, not for a public shared network.

What happens during an alarm?

During an alarm all positions are refreshed, so radio traffic temporarily rises. When planning capacity you must count the alarm peak, not only the average.

Why is airtime a limit and not only range?

The 868 MHz band is regulated by channel occupancy limits. Range can be improved with antennas and gateway placement, but airtime cannot be bought. The more frequent the report, the fewer devices fit into the same cell.

Position refresh interval in seconds

Position refresh interval in secondsBar chart: position refresh in the LoRa variant 20 s, app heartbeat 26 s.0102030sLoRa variant: 20 s20 sLoRa variantApp heartbeat: 26 s26 sApp heartbeat
Source: Offer cards and the device heartbeat function sheet

Questions about the gateway and the number of devices

How many devices one gateway can carry depends on three quantities: the frame size, the spreading factor and the frequency of reports. We do not give one number for all sites, because each of these parameters can change the result by an order of magnitude.

At the request stage the integrator should provide: the number of people on a shift, the zones with the densest traffic, the required position refresh time in normal work and during an alarm, and the availability of an own LoRa network at the site. From these data we calculate the airtime budget and only then choose the reporting rate.

  • number of people in one radio cell
  • required refresh frequency in daily operation
  • required refresh frequency during an alarm
  • number and placement of mesh receivers
  • own gateway in the organisation's network

When a phone or a Wi-Fi watch is the better choice

The LiveWorker app runs on Android phones and on watches with the Wear OS system. It scans BLE beacons and detects stillness and falls. Where the site has Wi-Fi or cellular coverage, this is a simpler route than building LoRa connectivity.

LoRa makes sense in places without network infrastructure, on large open yards, and where the site wants its own channel independent of the operator. In a building with good Wi-Fi the LoRa variant adds complexity without any gain.

What to prepare for the request

A complete request closes the discussion about the variant in one step. Describe the area in metres, the number of people, the required position accuracy and whether the site already has its own radio network. Position indoors results from signals of many beacons averaged on the map and works without GPS, so we prepare the beacon plan regardless of the choice of communication channel.

Video

Frequently asked questions

Does a LoRa watch need Wi-Fi or a SIM card?

No. The result of scanning BLE beacons travels by LoRa radio through mesh receivers to the gateway in the organisation's network.

Is it a series product?

No, it is a development solution. We treat it as an option agreed in the request, together with the airtime budget.

Will a report every 20 seconds work on a public LoRaWAN network?

Not for the whole workforce. Such a rhythm exceeds the network capacity and the airtime limits in the 868 MHz band, and the batteries last a few days.

Does the position depend on GPS?

No. The position results from signals of many BLE beacons averaged on the map, and LoRa is only the route by which the result is delivered.

Sources

Describe the area and we will calculate the radio budget

Send us the number of people, the area and the required refresh time. We will indicate whether the LoRa variant makes sense or whether Wi-Fi or a phone is enough.

Let's talk