How a call for help from the watch works
The SOS alarm is triggered by a gesture on the watch button: a triple click or a long press. After the gesture a three-second countdown starts, during which the worker can cancel the alarm. This is a compromise between speed and false alarms: a window that is too short increases the number of mistakes, while one that is too long takes time away from a person in danger.
SOS is a deliberate call. It works independently of the safeguards based on inferred inactivity, such as stillness, which the system derives from periodic signals and which depends on the device and user settings. For this reason treat SOS and stillness detection as two complementary mechanisms, not one.
Configuring the button on the watch
On the watch, the button works through the companion app, which runs after the button has been remapped in the device management system (Knox). The watch face itself does not read the button, so without remapping the gesture never reaches the app. This setting belongs to the IT administrator and should be part of the reference fleet configuration, not done by hand on every watch.
Before issuing a watch, check three things: whether the button is remapped, whether the app has its permissions, and whether a test alarm reaches the map. Run the test on every batch of devices, because system versions may behave differently.
SOS alarm stages from gesture to closure
What happens in the system after an alarm
Below is a breakdown by case, in the order in which they most often appear in real rollouts.
SOS permit
An SOS always creates its own permit from a template named SOS. If the location has no such template, the alarm still fires but no permit is created, so the record in the documentation is incomplete. Check the template before going live.
One alarm, one permit
Pressing SOS again while the worker's SOS permit is open does not create another permit or another notification. A panicking worker pressing the button repeatedly will not flood the dispatcher with duplicates.
Rescue chain
An SOS triggers a message in the messaging app and automatic calls from the PBX switchboard. Answering the call and confirming can close the permit. Movement by the worker does not close the alarm: only a person closes it, in the app or in the panel.
Sound on the map
The online map plays a siren for a new alarm only if the permit template has the sound option enabled. A silent report is a template without that option. Sound requires the map to be open in a browser, so the dispatch room must keep it on screen permanently.
How to limit false alarms
The three-second countdown is the first barrier. The second is training: the worker should know the gesture and know that they can cancel it. The third is a review of alarms after the first month. If most alarms were cancelled during the countdown, the gesture is too easy to trigger in that job, for example when the watch is constantly touched with a glove.
Do not add more clicks than necessary. A gesture the worker cannot perform under stress is worse than an occasional false alarm. Instead, make sure the dispatcher has a procedure for calling back and quickly closing a mistake.
Step-by-step rollout in one hall
Start with one hall and ten watches. Configure the profile, run test alarms from every station, and measure the time from the gesture to the alarm appearing on the map and on the phone at the switchboard. Record the result as a reference point. After two weeks, analyse the cancelled alarms and the conversations with workers: was the gesture understood, and did the dispatcher know what to do? Only then extend the rollout to other halls. This staging costs a few days and saves a whole series of corrections after a plant-wide rollout.
Evidence after an event
The SOS permit records who called for help, when and where, and the phone chain shows who answered. For OHS this is evidence that the lone-work procedure works, and material for the incident analysis. The system supports meeting the requirement to provide a way to call for help, but it does not release the plant from the risk assessment of the workstation.
Video
Frequently asked questions
Does SOS work without stillness?
SOS is a deliberate call and works independently of safeguards based on stillness. Stillness is a separate mechanism that depends on the device settings.
What if the alarm has no SOS template?
The alarm will fire, but no permit will be created. That is why the SOS template must exist in every location before rollout.
Does the map always play a siren?
Only when the template has the sound option enabled and the map is open in a browser.
Who closes the alarm?
A person: in the app, in the panel, or by confirming in the phone chain. The worker's movement does not close the alarm.
Let's talk about devices at your plant
We will show how to match devices to roles and how the system connects them on one map. Book a conversation with the InnerWeb team.
Let's talk