Transmitters in a wood dust hall: implementation notes for a joinery

Transmitters in a joinery hall must keep working despite dust deposits, and often in places classified as zone 22. Below are implementation notes: how many are needed, how to place them, what to consider in dust zones, and how to plan cleaning so that location accuracy does not deteriorate month after month.

25–50
transmitters for a 5,000 m2 hall (example calculation)

How many transmitters and where

The worker's position is determined from the signals of several transmitters and averaged on the map. As a guide, one transmitter per 100 to 200 m2 of building area is assumed. For a 5,000 m2 hall this gives about 25 to 50 transmitters: 5,000 divided by 200 is 25, and divided by 100 is 50. This is an example calculation, and the final number is set by the design of the hall.

In a joinery hall the number depends on partitions: racks, machines and extraction ducts attenuate the signal. A hall with dense equipment needs a number closer to the upper end of the range, an open hall closer to the lower end.

Zone 22 and ATEX execution

In zone 22, a cloud of combustible dust does not occur during normal operation, and if it does appear, it is short-lived, according to the definition of a dust zone in Directive 1999/92/EC. The directive sets minimum requirements for the health and safety protection of workers potentially at risk from explosive atmospheres, including the classification of zones, also for dust.

The InnerWeb industrial beacon has a CE declaration and an ATEX execution for zones 2 and 22. This page does not settle the classification of specific rooms: the plant makes that classification in its explosion protection document. For each mounting point, it has to be checked whether it lies in a zone for which the execution is designed.

Number of transmitters by hall area

Number of transmitters by hall areaBar chart: for a 5,000 m2 hall from 25 to 50 transmitters, for 2,000 m2 from 10 to 20, for 8,000 m2 from 40 to 80.020406080pcs1 transmitter per 200 m2 (2,000 m2): 10 pcs10 pcs1 transmitter per 100 m2 (2,000 m2): 20 pcs20 pcs2,000 m21 transmitter per 200 m2 (5,000 m2): 25 pcs25 pcs1 transmitter per 100 m2 (5,000 m2): 50 pcs50 pcs5,000 m21 transmitter per 200 m2 (8,000 m2): 40 pcs40 pcs1 transmitter per 100 m2 (8,000 m2): 80 pcs80 pcs8,000 m2
  • 1 transmitter per 200 m2
  • 1 transmitter per 100 m2
Source: Example calculation: as a guide, 1 transmitter per 100 to 200 m2 of building area

Mounting height and access

A transmitter mounted high, on a post or beam, is less often obscured by people and goods, but is harder to clean. Mounting it low makes servicing easier, but increases the risk of it being obscured or damaged by a forklift. The compromise is a height that can be reached from a platform or ladder without stopping production.

With wood dust, deposits collect on upper surfaces. Mounting in horizontal positions, on shelves and rails, encourages settling, so it is worth choosing vertical surfaces or mounting the transmitter so that dust does not lie on the housing.

Cleaning and calibration

Cleaning transmitters is included in the hall patrol as a standing checkpoint. The plant defines checkpoints on the map with their own checklists, so a transmitter can have its own point and list: condition of the housing, deposits, battery state. The worker's device reports the battery state and status, and a drop in location quality in one area is a signal to check the transmitters there.

Cleaning in a dust zone is carried out with the methods set out in the plant's explosion protection document, for example by suction, not by blowing, which lifts the dust.

Integrations and order of implementation

Implementation starts with the hall map and mounting points, then comes the mounting and calibration of transmitters in the hall, and finally the launch of location-dependent functions: adding workers to permits for the place of work and the evacuation list. InnerWeb works without GPS and is an independent system that complements the client's existing systems, so no changes to access control or ERP are needed for location to work.

  • prepare the hall plan and mark the zones from the explosion protection document,
  • set the number of transmitters at 1 per 100 to 200 m2,
  • choose the positions and heights with dust deposits in mind,
  • mount and calibrate in the hall, and test location on the patrol route,
  • include transmitter cleaning in the checkpoints.

Video

Frequently asked questions

Can a transmitter be placed in zone 22?

The InnerWeb beacon has an ATEX execution for zones 2 and 22. The plant classifies the rooms, and for each point it has to be checked that the mounting matches the result of that classification.

How does the system know that transmitters need cleaning?

From the patrol: a transmitter is a checkpoint with a list, and a drop in location quality in an area is a signal to check it.

Is GPS needed inside the hall?

No. InnerWeb works without GPS, and the position comes from the signals of several transmitters averaged on the map.

Sources

Plan the transmitters in the joinery hall

We will prepare an initial transmitter layout for your hall plan, taking dust zones and cleaning into account.