Why transfer zones onto the map
Zone 22 is a place where a cloud of combustible dust does not occur during normal operation and, if it does, only for a short time. This definition comes from Directive 1999/92/EC. The explosion protection document indicates which rooms and equipment meet it, but this document stays in a binder.
Once the zones are on the map, the information reaches the place where decisions are made: the person preparing the permit, the service company and the shift supervisor. The map turns a description into a binding picture that can be assigned to a specific place of work.
Step 1: collect the input data
Before you start drawing, collect the complete set of materials. The absence of any of them lengthens the work, because the classification of zones will have to be confirmed during the process.
- The current explosion protection document with the classification of dust zones.
- The hall plan or floor layout with numbered rooms.
- A list of dust sources: extraction ducts, filters, cyclones, sanders, silos, conveyors.
- A register of equipment in the zones with its ATEX markings.
Steps of marking zones on the map
Step 2: map the zones in the plant hierarchy
A catalogue of risks with the required protective measures can be assigned to a location: a hall, an area, a line or a place. The simplest approach is to create, in the plant hierarchy, entries corresponding to the zones in the document and give them names that the employee will recognise, for example the sanding hall or the filter station.
Risks can be edited in the permit and in the 3D map editor, separately for each building level. As a result, a zone on a mezzanine does not get mixed up with a zone on the ground floor, and changing one does not change the other.
Step 3: assign risks and protective measures
For each zone, add the risk of a dust explosion, the risk of ignition from hot work and the risk of smouldering deposits. The catalogue can also be assigned to a type of hazardous work, so the same entry works both for welding and for cutting.
The person ordering the permit can also complete risks ad hoc. As a result, a permit for work in zone 22 does not start from a blank form: the risks and protective measures appear from the location, and a person verifies them.
Step 4: cover work in several places with one outline
A permit covering several locations, for example a run of extraction equipment from a cyclone through a filter to a silo, is drawn on the map as a single outline on the hall plan. The coordinator sees which zone 22 areas fall within the scope of work and whether work is not taking place at the same time in a neighbouring one.
The printout of the permit is produced from current data, in the language of the employee, with pictograms of the risks and protective measures. The contractor receives what results from the map, not a form copied out by hand.
Step 5: keep the evidence for an audit
An auditor will ask how it is known that a zone on the map matches the document. The answer is a record of the agreement: the date, the person responsible for the explosion protection document and the version of the document against which the map was compared.
The system provides evidence of use: which permit was created in which zone, which risks were assigned and who approved them. The map supports compliance with the requirement, but does not replace the assessment of zones carried out by the persons authorised to do it.
Checklist
Video
Frequently asked questions
Who defines zone 22?
The plant classifies the zones in the explosion protection document, in accordance with Directive 1999/92/EC and national regulations. The system maps what the plant has defined.
Can risks be set separately for each floor?
Yes. Risks can be edited in the 3D map editor separately for each level of the building.
Does the map replace the explosion protection document?
No. The map makes the information from the document available where the permit is created, but the document remains the basis.