What the number of transmitters depends on
The position of an employee is produced from signals of several transmitters averaged on the map, and for a building an indicative rule of 1 transmitter per 100 to 200 m² is used. This is a starting value. The actual number depends on the structure of the hall, its height, the density of racks and machines, and how precisely the plant wants to know where each person stands.
A joinery plant has several features that affect the choice. Large machines and stacks of material create obstacles for the signal, and part of the hall is often open to a storage yard. That is why the calculation should be treated as a range rather than a single number, and refined after reviewing the hall plan.
Order of magnitude: 25–50 transmitters
Example calculation: a 5,000 m² hall with 1 transmitter per 100 to 200 m² requires about 25 to 50 transmitters. The lower value corresponds to a sparser layout, the upper value to a denser one. The difference is twofold, so the equipment budget should allow for both limits.
It is also worth remembering that not the whole hall requires the same accuracy. Zones where external companies work, hot work and forklift traffic take place need denser coverage than a raw material store or circulation routes.
- Lower limit: 5,000 m² divided by 200 m² gives 25 transmitters.
- Upper limit: 5,000 m² divided by 100 m² gives 50 transmitters.
- Middle value for a preliminary budget: about 38 transmitters.
Number of transmitters for a 5,000 m² hall
Cost structure in the investment budget
The cost of location is not limited to the price of transmitters. The budget is worth splitting into items that can be assigned to different funding lines, for example investment and maintenance.
We do not give a specific transmitter price in this article. Indicative price ranges from implementations in 2025 and 2026 are available on request, and the quotation is individual, because it depends on the design of the device and the installation conditions.
- Transmitters in the quantity of 25 to 50 units.
- Installation and power supply, including the version for explosion hazard zones if the hall contains them.
- Devices carried by employees and chargers.
- Hall map and configuration of the location in the system.
- Training of users, security and dispatchers.
- Maintenance: battery replacement, inspection and support.
How to calculate the budget before a demo
So that the plant director does not order a demonstration blind, it is worth preparing three figures: the floor area of the hall, the number of zones with increased requirements and the number of people who are to carry devices. From these the supplier calculates the scope of equipment and proposes a minimum and an extended variant.
The minimum variant covers the whole hall with a sparser transmitter grid. The extended variant adds denser coverage in the zones where the risk is greatest. The plant may start with the minimum variant and expand it after the first weeks of operating the system.
What this calculation does not cover
The example calculation does not include costs that depend on the plant: changes to the electrical installation, any work at height during installation, or integration with existing systems such as access control or time and attendance. InnerWeb is an independent system that supplements these systems and works without GPS, but integrations require a separate scope.
It also does not include savings. Savings depend on what the plant loses today: time spent looking for people, production stoppages, security visits. The plant should assess this part of the calculation on its own data, ideally after the first demonstration.
Number of transmitters for a 5,000 m² joinery hall
| Parameter | Value |
|---|---|
| Hall area | 5000 m² |
| Area per 1 transmitter, lower density limit | 100 m² |
| Area per 1 transmitter, upper limit | 200 m² |
Result: About 25–50 transmitters; for a preliminary budget the middle value of about 38 units.
Note: Example calculation for a joinery-type hall. The final number depends on the hall plan, the structure and the required accuracy; individual quotation.
Video
Frequently asked questions
How many transmitters are needed for a 5,000 m² hall?
With an indicative layout of 1 transmitter per 100 to 200 m², about 25 to 50 units. The final number is set after reviewing the hall plan.
Is the layout uniform across the whole hall?
It does not have to be. Zones with external companies, hot work and forklift traffic usually require denser coverage than a raw material store.
Does location require GPS?
No. The position from several transmitters is averaged on the map, so the system also works inside the hall.
Does the budget include the price of a transmitter?
We do not give a unit price. Indicative ranges from 2025 and 2026 implementations are provided on request, and the quotation is individual.