What zone 22 means in a plant with wood dust
Zone 22 is a place where a cloud of combustible dust does not occur during normal operation and, if it does occur, only for a short time. Directive 1999/92/EC, which sets the minimum requirements for protecting the health and safety of workers exposed to explosive atmospheres, adopts this definition of a dust zone.
In wood and furniture plants, dust zones are usually defined around extraction ducts, filters, cyclones, sanders and silos. The exact boundary of a zone is decided by the explosion protection document of the plant, not by the supplier of the location system.
Can person location be used in zone 22
Location is based on two types of equipment: transmitters mounted in the hall and a device carried by the employee. The InnerWeb industrial radio beacon has a CE declaration and an ATEX design for zones 2 and 22. This means the manufacturer declares that the device is suitable for work in such zones.
That suitability does not release the plant from its own assessment. The plant checks whether the category, group and temperature class of the device match the conditions at the installation site, and includes the device in the explosion protection document. InnerWeb supplies the device documentation, and the decision to use the device rests with the plant.
Hall area per single transmitter
What may be claimed about the device and what may not
Statements about the device in materials and conversations should be backed by documentation. The division below helps the head of security assess what suppliers say, including us.
Permissible claims
It may be said that the InnerWeb industrial radio beacon has an ATEX design for zones 2 and 22 and a CE declaration. It may be said that the system works without GPS and supplements the client's existing systems, such as access control, time and attendance, HR and ERP.
Claims that are not permissible
It may not be claimed that the device is approved for zone 0 or zone 1 if the documentation does not cover this. The ATEX design of the beacon may not be transferred to devices carried by employees unless their documentation contains it. It may also not be promised that a location system replaces an explosion risk analysis.
How employee location works in a hall with dust
The employee carries a BLE device, which sends which transmitters it hears, at what signal strength, its battery state and its status. From this the platform knows the person's position. Signals from several transmitters are averaged on the map, and for a building an indicative rule of 1 transmitter per 100 to 200 m² is used.
In a hall with wood dust this means placing transmitters at the structure rather than at the machines from which the dust is released. The system does not require GPS, so it also works under a roof and near metal sheet walls, where satellite reception is often weak.
What to do on the plant side
Questions to the supplier end with the documentation, and responsibility for the zones stays with the plant. The list below organises what the head of security should have in hand before ordering a demonstration or an installation.
- Collect the current explosion protection document and the map of dust zones.
- Mark on the hall plan the places where transmitters would be mounted and their distance from extraction ducts and filters.
- Ask the supplier for the CE declaration and the marking of the device for the specific zone.
- Establish whether devices carried by employees enter dust zones, and check their documentation separately.
- Enter the devices into the explosion protection document after a decision by the responsible person.
Video
Frequently asked questions
May transmitters be used in zone 22?
The InnerWeb industrial radio beacon has an ATEX design for zones 2 and 22. Its use at a specific place must however be confirmed by the plant in the explosion protection document.
Does location require GPS?
No. The position is produced from signals of several transmitters averaged on the map, so the system also works inside halls.
Does InnerWeb replace an explosion hazard analysis?
No. A location system supports safety, but the assessment of zones and protective measures belongs to the plant and to the persons authorised to make it.
Who is responsible for classifying dust zones?
The plant as the employer, in accordance with Directive 1999/92/EC and the national regulations implementing it. The device supplier is responsible for the device documentation.
Sources
Let us check location in your dust zones
We will arrange a conversation about the device documentation and the layout of transmitters in a hall with wood dust.
Let's talk