InnerWeb
Skip to main content

Recommendations: map base layer, orthophoto or OSM

The base layer decides whether the dispatcher recognises the plant grounds at first glance. The primary base is an orthophoto map, and optionally a vector OSM base can be added and blended smoothly with a transparency slider. Below are recommendations for the IT integrator who prepares the browser environment for security.

2
bases to choose from: orthophoto and vector OSM
Source: card
3
georeferencing parameters: anchor, rotation, scale
Source: card

What is available and how blending works

The base layer is an orthophoto map. Optionally, a vector OSM base of your own can be added to the map, and the user blends it smoothly with the orthophoto using a transparency slider. This means the choice is not all or nothing: the same map can look like an aerial photograph, like a diagram of roads and buildings, or like any intermediate value.

The online map is built in the browser, so both bases load on the dispatcher's workstation. The IT integrator should therefore expect that the browser must reach the sources of the base layer and the plant's 3D assets, and that security computers should not have any blocks that prevent this.

Recommendations for choosing the base layer

Five recommendations that make the decision easier. Each has a justification in how the map handles the base layer.

1. Start with the orthophoto

The orthophoto is the default base and allows the terrain to be recognised from real objects: yards, roads, car parks and roofs. For security, which knows the plant from patrols, this is the fastest orientation.

2. Add OSM when you need clearer roads

The vector OSM base shows the layout of streets and names more clearly. It is useful when the dispatcher directs vehicles around the plant and needs to see which road they will take.

3. Use a slider instead of a switch

Smooth blending lets you set the transparency according to the time of day and the task. In daylight more orthophoto is useful, and for a road report more vector.

4. Check the base against the building solids

A saved building outline can be moved or corrected, and the solids come from one GeoJSON file per plant. If the base and the outline do not line up, first check the anchor and the rotation of the hall.

5. Test on the dispatcher's station, not only in IT

The browser environment in the IT department is often different from the security station. Open the map on the computer where the dispatcher will work and check whether the base loads without delays.

Base transparency at three slider settings

Base transparency at three slider settingsBefore and after chart shows that in daylight the orthophoto dominates (80 to 20), and for a road report the OSM base does (70 to 30).020406080%Orthophoto (Day, patrol): 80 %80 %OSM base (Day, patrol): 20 %20 %Day, patrolOrthophoto (Road report): 30 %30 %OSM base (Road report): 70 %70 %Road report
  • Orthophoto
  • OSM base
Source: Example slider settings, an illustration of the blending rule, not measurement data

Dependence on georeferencing

The base requires correct georeferencing of the hall. It rests on an anchor point (latitude and longitude), a rotation and a scale, which link the hall's local metre grid to a point on the ground. The full map works once the hall's anchor and rotation and the plant's 3D assets are set. A wrong setting shows up as the hall standing next to its own place on the orthophoto.

That is why the choice of base should end with a check on several reference points: a corner of the hall, a gate and a road junction. If these three places match reality on both bases, the map is ready for further work.

Short checklist for the integrator

Before you hand the map over to security, go through the points below. They take a few minutes and save conversations of the type "something moved on the map".

  • the orthophoto loads on the dispatcher's station
  • the vector OSM base, if used, loads together with the orthophoto
  • the transparency slider works smoothly in both directions
  • the building solids cover the roofs on the orthophoto
  • the three reference points match reality

When the base is not enough

The orthophoto and OSM show the plant from the outside. The interiors of buildings are shown through solids and floors on the online map, not through the base. If security needs more detail inside, complete the structure of the plant in the map editor: buildings, floors and names.

Remember also that the online map shows one hall at a time. The base is therefore shared across the whole facility, but the content of the layers depends on the selected hall. When planning the rollout, decide which hall is the starting one and check the base on it first.

Video

Frequently asked questions

Is the OSM base mandatory?

No. The primary base is the orthophoto, and your own vector OSM base can be added optionally.

How are the two bases combined?

With a transparency slider that blends OSM with the orthophoto smoothly, without switching maps.

Why does the hall not line up with the base?

Most often because of georeferencing. Check the anchor (latitude and longitude), the rotation and the scale of the hall.

Does the base require an application?

No. The online map is built in the browser, so the base loads on the workstation.

Sources

Check the base on your plant

We will show the orthophoto and the vector base on the plan of your facility. Book a conversation with the IT integrator and security.

Let's talk