Why a list before editing
The structure of the plant, that is the buildings, the number of floors and what stands inside, is drawn in the 3D map editor, and the security function and the permit flow later use its data. Gaps therefore show up not only on the map but also in the subsequent modules.
The map is prepared separately for each object, so the list is worked through separately for each hall or building.
Structure model: choose before drawing
The editor distinguishes two models. In a large-object plant a hall is a view or a department, an area is a building and a line is a floor. In a single-hall plant a hall is the hall itself, an area is a zone within it and a line is a production line.
The choice of model affects the naming and what carries a volume: in the large-object model the hall is an organisational division, so it has no volume.
Share of data groups on the list
File data and setting data
Building volumes come from one GeoJSON file per plant, and what the user draws or names in the editor is saved in the database and linked with the file. Uploading the file again does not delete manual work, so you can start from an imperfect file.
Setting data are the anchor with latitude and longitude, the rotation and the scale, which tie the local metre grid of the hall to a point on the ground. The full map works once the hall anchor and rotation are set and the plant's 3D resources are available.
What you do not need at the start
You do not need a complete list of transmitters or permits, because the map is the common basis for the subsequent modules. You can start with the hall of the highest risk and extend the scope.
Nor do you need to settle all the names immediately: a name appears on the map for an area with an outline and a height, and where the match is ambiguous the system leaves it without a name instead of guessing.
Comment on the most important points
The anchor and the rotation are the items whose absence blocks the most: without them the metre grid of the hall is not tied to the ground and the full map will not start. Collect them first and record the source they come from, so that after a reconstruction you know what to verify.
The list of objects is the second critical point. Because the map is prepared separately for each object, a clear order of halls lets you show the first results already after the first week and establish whether the base layer and the naming are accepted before the work covers the whole plant.
Who is responsible for what
The project manager collects the plan, volumes and floors, the technical department provides the surveying data or confirms the anchor, and the health and safety or security manager accepts the names and the division into departments. It is good to record these roles at the beginning, because ambiguous matches of volumes to areas require a decision from a person who knows the plant.
When the input data are incomplete, do not stop the project: start with the object for which the complete set is available and complete the others in parallel.
Checklist
Video
Frequently asked questions
Do I have to have a GeoJSON file?
It is not required at the start, but it speeds up editing, because the volumes come from one file per plant.
What if the plan is on paper?
Plan extra time to reconstruct the outlines and enter it in the schedule.
Do the data concern the whole plant at once?
No, the map is prepared separately for each object.