InnerWeb
Skip to main content

From the evacuation list to the map floor: implementation notes for the administrator

The show-on-map button in the evacuation list saves the coordinator time, but it works only when several configuration elements are in place. Below are implementation notes: the conditions, the order in which the floor is determined, the waiting time of up to 21 seconds and the reason some employees do not get the button.

21 s
maximum wait for the outlines and the list to load
Source: card
13 s
list refresh interval
Source: card

What the show-on-map button does

From the evacuation list the coordinator can go to the map and see the person on their level. The transition waits up to 21 seconds for the building outlines and the employee list to load, then opens the view of the person on their floor. The waiting time comes from loading the data, not from an error.

For the coordinator the effect is what matters: from a name on the list to the floor where the person is, with one click. Without this path they would have to find the building manually, open the selector and choose the level.

Conditions for the button to work

The button requires three things: the person must be visible on the online map, linking of building outlines with area data must be switched on, and the system must be able to determine their floor.

Linking outlines with areas

Entering a floor from the online map works only when linking building outlines with area data is switched on. It is off by default, so without it a double-click does not show floors, and the path from the list does not open the level. This is the first thing to check when the button is there but does not lead to the floor.

Order of determining the floor

The system determines a person's floor in this order: the floor of the location, then the line, then the area, and the building outline is taken first from the link with the area, then from a point inside the outline. If the administrator has assigned transmitters to a location with a floor, the determination is the most precise. When that is missing, the system goes down to the next sources and the result is less certain.

Timings of the evacuation list and the transition to the map (seconds)

Timings of the evacuation list and the transition to the map (seconds)Bar chart: list refresh every 13 seconds, maximum map transition wait of 21 seconds.0510152025sList refresh: 13 s13 sList refreshMaximum wait for the map transition: 21 s21 sMaximum wait for the map transition
Source: Function cards: the list refreshes every 13 s, the transition waits up to 21 s

Why some employees do not have the button

The show-on-map button is given only to a person who is visible on the online map. An internal employee whose position is not tracked does not have the button, because an empty map would be worse than no button. A coordinator who clicked such a button and saw an empty plan might conclude that the person is not in the building.

For the implementation this has a practical consequence. Before an evacuation exercise, establish which groups of employees have position tracking, and inform the coordinators that a missing button does not mean a missing person. Such a person is on the list, but is searched for in the traditional way, by group and by the floor assigned in the documents.

The 21-second waiting time

The transition from the list to the map waits up to 21 seconds for the building outlines and the employee list to load. In a large plant with many buildings loading can take longer than in a small office block. The coordinator should know this, so they do not click again after a few seconds.

Implementation practice: check the transition time on the computer the coordinator will use during an alarm, and write into the instructions that waiting is normal.

Test plan before go-live

The test has four steps and takes a short time, and it reveals a missing configuration before an alarm does.

  • Choose three people from different floors who are visible on the online map.
  • On the evacuation list click the show button for each of them and note on which floor the map opened.
  • Compare with the actual floor of each person and note the differences.
  • Check one person whose position is not tracked, and confirm that the button is missing.

Documentation for coordinators

Prepare a short instruction for the evacuation coordinators: when the button is there, when it is not, how long the transition takes and what to do when the map opens a different floor from the one expected. One page is enough, as long as it is available where the coordinator works.

Video

Frequently asked questions

Why does the transition from the list to the map take so long?

The transition waits up to 21 seconds for the outlines and the employee list to load. Then it opens the view of the person on their floor.

Why do some employees not have the show-on-map button?

The button is given only to a person visible on the online map. An employee whose position is not tracked does not have it, because an empty map would be worse than no button.

The button is there, but the map does not open the floor. What should I check?

First, whether linking of building outlines with area data is switched on. It is off by default, and without it the floors do not open.

Want to test the path from the list to the map?

We will run a test of three people from different floors with you and check the configuration. Book a call.

Let's talk