InnerWeb
Skip to main content

FAQ: who is on which floor during an alarm

A security manager asking about floors during an alarm needs two answers: who the system will point to and on what basis. Below are the questions raised at the tender stage, answered on the basis of how the evacuation list and the indoor building map work.

13 s
refresh interval of the evacuation list
Source: karta
6
groups in the list, in a fixed order
Source: karta
12 h
entry without exit after which a person moves to the Uncertain group
Source: karta

How does the system know who is on site right now?

The evacuation list answers one question: who is physically on site right now. It is built from QR scans at the gate, so the basis is the register of entries and exits, not a supervisor's declaration or a shift roster. The list refreshes every 13 seconds, so a person who has just passed the gate appears in the list without any manual action.

For security this means a different quality of data than a paper roster printed a few hours earlier. The printout is generated at the moment of the alarm, one page per group, and can be handed to the coordinator at the assembly point straight away.

How is the list divided into groups, and why in this order?

The list has six groups in a fixed order: guests, couriers, suppliers, employees, external companies and the Uncertain group. External companies have a tab per company, so the coordinator finds a subcontractor without scanning the whole list.

The fixed order has a practical purpose. People who do not know the site, that is guests and couriers, come first, because nobody will look for them from memory. Own employees are usually known to their supervisors, and their list is the longest.

  • guests: people admitted by a host, often without knowledge of evacuation routes
  • couriers and suppliers: short stays, but a high risk of being missed
  • employees: the largest group, best known to supervisors
  • external companies: a separate tab for each company
  • Uncertain: people whose presence the register cannot clearly resolve

Time parameters of the evacuation list

Time parameters of the evacuation listBar chart: list refresh 13 seconds, map wait 21 seconds, Uncertain threshold 12 hours, default window 24 hours0510152025seconds or hours (as labelled)List refresh (s): 13 seconds or hours (as labelled)13List refresh (s)Wait for map (s): 21 seconds or hours (as labelled)21Wait for map (s)Uncertain threshold (h): 12 seconds or hours (as labelled)12Uncertain threshold(h)Default window (h): 24 seconds or hours (as labelled)24Default window (h)
Source: Description of the evacuation list function and switching to the map

Will the system show the floor a person is on?

Yes, provided the person is visible on the online map. From the evacuation list you can go to the map and see the person's position on their floor. A double click on an employee opens the building at the floor where that person is, and the system determines the level in turn from the level of the location, then from the line, then from the area.

Switching from the list to the map waits up to 21 seconds while the building volumes and the list of employees load. During that time the view does not freeze, it prepares the data. The floor is therefore not guessed from the last gate scan: it comes from location data, if such data exists for that person.

Why do some people have no show-on-map button?

Only a person visible on the online map gets the show-on-map button. An internal employee whose position is not tracked has no button. This is a deliberate design decision: an empty map after a click would be worse than no button, because it would suggest the person is not in the building.

For security the conclusion is practical: no button does not mean the person is missing from the list. Such a person still appears in the roster from the gate register and is searched for by group and by last known place, for example their department or company.

What is the Uncertain group and when does someone end up in it?

The Uncertain group collects people whom the gate register still counts as present, although the data suggests otherwise. It includes a person whose entry is older than 12 hours with no recorded exit, a person refused at the gate who is nevertheless inside, and a training participant without a signal. The default window is 24 hours.

The design of the list rests on an asymmetry of error. A person listed by mistake costs an unnecessary search, but a person left out is someone nobody looks for. That is why the system prefers to show too many people rather than too few, and it marks uncertainty instead of hiding it.

What about a person on training, and what does the list not promise?

A person clocked in at a training station appears on the list as training in progress, and passing the company's own exam records their entry to the site. In this way a course participant does not disappear from the roster just because they have not yet gone through the ordinary gate.

The list does not promise absolute completeness. In the printout the header and footer with the note on the data source repeat on every page, so that a middle sheet does not look like a complete list of everyone present. The list shows what follows from the entry register, and the decision to end the search is always taken by a person, in line with the site procedure.

Video

Frequently asked questions

Does the list replace the roll call at the assembly point?

No. The list shows whom to look for and in which group, but confirming that a person has reached the assembly point is still done by the coordinator. The list data speeds up the roll call, because each coordinator gets their own page.

Does security need access to the online map?

It is not a condition for using the list, but it allows you to see a person's floor if their position is tracked. Map permissions are granted by the administrator, and the list also works from the gate register data alone.

What should be done with a person from the Uncertain group?

Treat them as present until their exit is confirmed. The site procedure should describe who verifies such people and in what order, for example first a call to the host or supervisor.

See the evacuation list on your building

We will show the list and the floor preview on a sample site and go through the gate data you need to prepare for your facility.

Let's talk