InnerWeb
Skip to main content

Checklist before an evacuation drill by floor

The day before an evacuation drill in a multi-level building, the coordinator should check the data the list is built from: groups of people, floors on the map, the printout and the Uncertain group. This checklist sets out those steps and explains why each one matters.

13 s
refresh interval of the evacuation list
Source: karta
6
groups of people on the evacuation list
Source: karta

Why check the data the day before

The evacuation list answers the question of who is physically on site right now. It is built from QR scans at the gate and refreshes every 13 seconds, so on the day of the drill it is always current. That does not mean it is always complete: its quality depends on what was entered into the system beforehand.

The day before the drill is the last moment when gaps can still be filled without time pressure. Discrepancies found then will not distort the drill's results.

Groups of people: six groups in a fixed order

The list has six groups: guests, couriers, suppliers, employees, external companies with a tab for each company, and the Uncertain group. The coordinator checks whether the external companies that will be on site on the day of the drill have their own tabs, and whether each company has its people assigned.

It is also worth deciding who collects the printout for each group. The printout is produced one page per group, so coordinators are assigned by group, not by floor.

Time parameters worth knowing before a drill

Time parameters worth knowing before a drillChart: list refresh 13 s, map wait 21 s, Uncertain threshold 12 h, default window 24 h0510152025seconds or hours (as labelled)List refresh (s)List refresh (s): 13 seconds or hours (as labelled)13Wait for map (s)Wait for map (s): 21 seconds or hours (as labelled)21Uncertain threshold (h)Uncertain threshold (h): 12 seconds or hours (as labelled)12Default window (h)Default window (h): 24 seconds or hours (as labelled)24
Source: Description of the evacuation list function

Levels and the map: can the floor be shown

Only a person visible on the online map gets the show-on-map button. The coordinator therefore checks whether the floors exist in the editor, whether building volumes are linked to areas, and whether linking building volumes to data is switched on, because it is off by default. Without this, a double click will not show the floors.

Switching from the list to the map waits up to 21 seconds while the building volumes and the list of employees load. It is worth doing this once as a trial before the drill, so that you know what to expect.

The Uncertain group and people on training

The Uncertain group collects people whom the gate register still counts as present: an entry older than 12 hours with no exit, a person refused at the gate who is nevertheless inside, and a training participant without a signal. The default window is 24 hours. The day before the drill it is worth reviewing this group and clarifying outstanding entries.

A person clocked in at a training station appears on the list as training in progress, and passing the company's own exam records their entry to the site. If training takes place on the day of the drill, the coordinator should know that participants will be on the list in a separate category.

Printout and the note on the data source

In the printout the header and footer with the note on the data source repeat on every page, so that a middle sheet does not look like a complete list of everyone present. The coordinator therefore checks that the printer at the command point works and that there is enough paper and toner for the number of pages.

During the drill it is possible to measure how long it takes to hand the pages to the group coordinators. That time is a useful measure and can be compared with later drills.

Checklist

Video

Frequently asked questions

Does the list need manual refreshing during the drill?

No. The list refreshes every 13 seconds, so it is enough to open it and print one page per group.

What should be done with people from the Uncertain group during the drill?

Treat them as present until confirmed. After the drill, clarify the cause of the entry, for example a missing exit scan, and improve the procedure at the gate.

Why does not every person have a map button?

Only a person visible on the online map gets the button. An employee whose position is not tracked is on the list, but has no button, because an empty map would be worse than no button.

Let us run an evacuation drill from the data

We will help prepare a checklist for your building and show the evacuation list with the floor preview on a sample facility.

Let's talk