Why not delete the building
The first instinct after extending a hall is to delete the old building and add a new one. This, however, means losing everything assigned to the old object: zones inside it, production lines, floors and risks. Rebuilding that data is tedious, and when changes are made while the warehouse is working it is risky for information continuity.
A saved building can be moved or its outline corrected without deleting it, so it keeps its zones, lines and risks. This is the recommended route for most geometry changes: an added hall section, an extended dock, a shifted external wall.
Stages of the change
The order below limits the risk of mistakes and lets you check each stage before the next.
- Make a copy of the structure data or save a snapshot of the current map state with the division into zones and lines.
- Open the existing building for editing and correct its shape instead of creating a new one.
- Check whether the zones inside the building still lie within the outline; move or correct any that were pushed outside the wall.
- Verify the risks assigned to the building level: the editor lets you assign them, and the permit control and the dispatch centre use them.
- Update the beacon positions if the rebuilding changed where they are mounted.
- Do a walk with a phone and check that the route on the new layout has no jumps.
Data to rebuild: deleting the building vs. correcting the outline (example)
- Deletion and new building
- Outline correction
What to do with beacons after the rebuild
The beacon position is stored in the database in centimetres, while the map displays it divided by 100. When moving a device in the hall, you must therefore correct the entry, remembering the unit. An error of an order of magnitude places the beacon in a completely different spot.
If a beacon has been removed, do not delete its entry without need: spare entries of inactive beacons are not deleted, because the device may start broadcasting again. When planning a larger change of layout, take into account the density rule: one beacon per 100 to 200 m2 inside a building and about every 100 m on the access road.
Old routes after the change
Route points are immutable records of the signal moment, so correcting a beacon position or an outline applies only to future deliveries. Old routes keep the jump or the position from the previous layout. There is no need to rewrite them, but it is worth marking the date of the rebuild in the change log.
When comparing reports from before and after the rebuild, rely on the date of the change. Jumps in historical data that result from the previous installation do not indicate an error in the new layout.
Pitfalls during the rebuild
The most common is correcting the outline without checking the zones that ended up outside it. The second is changing the layout without updating the beacons, which shifts vehicles on the map by the distance the wall moved. The third is duplicating an identifier when mounting new devices: two beacons with the same major:minor several hundred metres apart are recognised by the system as one entry, so the vehicle will jump between places.
The fourth pitfall concerns people: the shift supervisor should see the new layout on the map before the hall starts working in the new configuration.
Video
Frequently asked questions
Will I lose zones and lines when I correct the outline?
No. The saved building can be moved or its outline corrected without deleting it, so it keeps its zones, lines and risks.
Will old routes change after the rebuild?
No. Route points are immutable records of the signal moment, so the correction applies only to future deliveries.
What about beacons that were removed?
Do not delete their entries without need, because the device may start broadcasting again. The entry stays as a spare or disabled one.
Planning a hall refurbishment?
Let's discuss how to carry the change over to the map without losing zones, lines and risks, and how to update the beacons.
Let's talk