How the map knows the vehicle position
The vehicle position comes from signals of several BLE transmitters averaged on the map, without GPS. Plant roads are fitted with transmitters roughly every 100 m, so the vehicle is visible also between halls and under canopies.
For the duty officer this means that the point on the map is the result of averaging, not an exact coordinate. When judging whether a driver is at the right junction, look at the direction of travel and the route, not only at a single point.
What the vehicle colours mean
The online map marks three situations with colour, which the duty officer should recognise within a few seconds.
- Red: a vehicle with navigation for a foreign driver.
- Black: a vehicle under special supervision.
- White: the other vehicles.
Why red needs attention
Voice navigation for the driver works in one of 10 languages and relies on an editable matrix of messages at junctions. A foreign driver relies on it more than a local one, so a red point is a signal to look at their route more closely, especially when the junction is not in the matrix.
Why the system sometimes stays silent
When the approach arm is unknown, the system stays silent, because a wrong direction is worse than no message. Silence does not mean a fault: it means there is no certainty about the direction. If the driver stops at a junction, the duty officer can help them over the radio.
The route from the entry
The delivery route preview shows the path of the locator from the entry to the plant up to the current moment, together with stops longer than one minute. One line tells the whole story of the vehicle on site: which way it drove, where it stopped and for how long.
A stop longer than one minute can be perfectly normal: the driver is waiting for the scale, for unloading or at a dock gate. It becomes a signal only when it does not fit the stage of the delivery, for example a stop in the middle of the road between halls.
How security uses the map on duty
When a driver reports that they are lost, the duty officer checks their route and does not ask where they are. If there is a suspicion that the driver left the designated road, the officer compares the route with the delivery plan. For a locator not returned after leaving, the officer checks whether the last points are at the exit gate.
A locator that is offline or at 5% battery or below is shown in the service tab with a recommendation to charge. When a driver disappears from the map, first check this tab, because a lack of signal may mean a flat battery, not leaving the plant.
What the map does not do
The InnerWeb feature documentation does not describe reading vehicle registration plates or controlling a barrier. The vehicle map shows locators issued to drivers, not all cars on site. A car without a locator, for example a guest who drove in their own car, has no point on the map until they receive a device.
Before rollout it is therefore worth deciding which groups of vehicles receive a locator: suppliers from the yard, guests entering the production site, service companies. Only then does the map answer the question where the vehicles that matter for safety are.
Video
Frequently asked questions
Does the map show all cars on the site?
No. It shows vehicles with a locator issued to the driver. A car without a locator has no point on the map.
What does a stop longer than one minute on the route mean?
A place where the vehicle stood for more than a minute. It can be normal at a scale or a dock, and becomes a signal when it does not fit the stage of the delivery.
Why does navigation sometimes stay silent?
When the approach arm is unknown, the system stays silent, because a wrong direction is worse than no message.
See the vehicle map in a demo
We will show the colours, the route from the entry and the stops on an example delivery. Book a demo with the InnerWeb team.
Let's talk