InnerWeb
Skip to main content

Issuing a driver locator: checklist for security at the gate

Issuing a locator takes the duty officer a dozen seconds, and a mistake at that moment carries through the whole delivery. Below is a checklist to go through in the entry lane: battery status, navigation language, the special supervision flag and the agreed return.

5%
battery threshold at which a locator requires charging
Source: deliveries function documentation
10
languages of driver voice navigation
Source: navigation function documentation

When to use this list

The list applies to delivery drivers entering the plant yard who receive a locator at the gate. The driver gets a BLE locator, and the pool is limited to the transmitters of the gate, so the duty officer issues only devices that the system shows as assigned to their gate.

The list is deliberately short. The duty officer in the entry lane has no time for a procedure with ten points, but can carry out five checks for every driver.

Commentary on the checklist points

Each point on the checklist follows from a specific system function.

Battery

The service tab shows devices that are offline or have a battery at 5% or below, with a recommendation to charge. We do not issue such a locator: it may run out of power during the delivery and disappear from the map. The device goes on the charger and another one is taken from the pool.

Navigation language

Voice navigation for the driver works in one of 10 languages and relies on an editable matrix of messages at junctions. The duty officer asks the driver which language the locator should speak and sets it before issuing. Skipping this step is the most common reason for complaints about unintelligible messages.

Map marking

The online map marks with colour a vehicle with navigation for a foreign driver (red), a vehicle under special supervision (black) and the others (white). If the driver is to be under special supervision, for example because of the type of cargo, the duty officer sets this at issue, not afterwards.

Delivery data

After the code of the delivery card, the system fetches the data of the planned delivery from the client's delivery booking system via SOAP and pre-fills the form. Integration with a different booking system requires implementation work. A delivery with a closed transport in the booking system is deliberately treated as having no data, so the duty officer does not copy the previous driver's data into a new delivery.

Locator issuing parameters

Locator issuing parametersHorizontal bar chart of issuing parameters: battery threshold 5 percent, 10 navigation languages, stops marked from 1 minute.0246810value in the stated unitBattery threshold for charging(%)Battery threshold for charging (%): 5 value in the stated unit5Available navigation languages(pcs)Available navigation languages (pcs): 10 value in the stated unit10Stop marked on the route (min)Stop marked on the route (min): 1 value in the stated unit1
Source: Deliveries, locator navigation and route preview function documentation

Returning the locator

Tell the driver at issue where and when to return the locator. Most devices are lost when the driver leaves the yard in a hurry and nobody reminds them about the return. At exit the duty officer checks whether the device came back, and if not, opens the delivery route preview, which shows the path from the entry to the current moment and stops longer than one minute.

What security records after issuing

Every lookup by the delivery card code is recorded in telemetry (code, result, status, response time), so a report that a card does not work can be confirmed or disproved with figures. The duty officer does not have to write a note about every problem: it is enough to give the time, and the administrator can reconstruct the event from telemetry.

Checklist

Video

Frequently asked questions

What to do with a locator below 5% battery?

Do not issue it, put it on the charger and take another one from the pool. The service tab shows such devices with a recommendation to charge.

How does the system know the delivery data from the card code?

It fetches it from the client's delivery booking system via SOAP and pre-fills the form. Integration with a different booking system requires implementation work.

Can a locator be issued for a delivery with a closed transport?

The system treats a delivery with a closed transport as having no data, so that a foreign driver is not assigned to it.

Rehearse the issue in a demo

We will show the whole entry lane: issuing a locator, language, status and return. Book a demo with the InnerWeb team.

Let's talk