InnerWeb
Skip to main content

Driver locator in the yard: FAQ on battery, route and return

The duty officer at the gate either gets the locator back or does not: that decides whether the pool of devices is enough for the next shift. We have collected answers on battery, offline status, missing returns and route preview, based on what the system actually shows.

5%
battery threshold at which a locator is recommended for charging
Source: deliveries function documentation
10
languages of driver voice navigation
Source: navigation function documentation
30
locators in the illustrative pool for 12 simultaneous deliveries
Source: illustrative calculation

How the locator knows where the vehicle is

The vehicle position comes from signals of several BLE transmitters, averaged on the map. The system does not use GPS, so it works also where satellites are blocked by halls and canopies. Plant roads are fitted with transmitters roughly every 100 m.

Why does the locator sometimes show the vehicle with a delay?

Averaging over several transmitters smooths out jumps, but it means the position changes smoothly rather than instantly. On a stretch without transmitters, wider than about 100 m, the position may be less precise. This is an argument for reviewing the transmitter layout before rollout, not for replacing devices.

Battery and offline status

The locator pool is limited to the transmitters of the gate, and the service tab shows devices that are offline or have a battery at 5% or below, with a recommendation to charge. For the duty officer this is a ready list of devices to put on the charger, without checking devices one by one.

What should be done with a locator at 5% battery?

Do not hand it to the next driver. A locator this low may run out of power in the yard and disappear from the map in the middle of a delivery. Put it on charge, issue another one from the pool, and every duty officer will see its status in the service tab.

The locator is offline. Is it a fault?

Not necessarily. Offline means the system is not receiving a signal from the device: the battery may have run out, the device may have been switched off, or the driver may have left the site with it. First check whether the delivery is closed, then the last position on the route preview.

Illustrative locator pool for 12 deliveries

Illustrative locator pool for 12 deliveriesBar chart: 24 locators in use, 6 in reserve, 30 in total.0102030pcsIn use: 24 pcs24 pcsIn use25% reserve for charging: 6 pcs6 pcs25% reserve for chargingTotal: 30 pcs30 pcsTotal
Source: Illustrative calculation: 12 deliveries, 2 locators per delivery, 25% reserve

The driver did not return the locator

The most common situation after leaving the yard is that the device did not come back to the gate. The procedure depends on where the locator was last seen.

How to establish whether the locator has left the plant?

The delivery route preview shows the path of the locator from the entry to the plant up to the current moment, and stops longer than one minute. If the last points are at the exit gate, the device most likely left with the driver. If they end in the yard, look for it in the vehicle left behind or at the loading station.

Does a missing return block the next deliveries?

One missing locator reduces the pool. That is why it is worth counting the spare devices in advance: the example calculation assumes 12 deliveries at the same time, 2 locators per delivery and a 25% reserve for charging, which gives 30 units. This is an illustrative assumption, not a result from a deployment.

Map colours and navigation language

On the online map, colour marks a vehicle with navigation for a foreign driver (red), a vehicle under special supervision (black) and the others (white). The duty officer sees at once which driver needs more attention.

Voice navigation for the driver works in one of 10 languages and relies on an editable matrix of messages at junctions. When the approach arm is unknown, the system stays silent, because a wrong direction is worse than no message. If a driver reports that the locator says nothing, check whether the junction is in the matrix before assuming the device is broken.

Checklist

Video

Frequently asked questions

Does a locator need GPS?

No. The position comes from signals of several BLE transmitters averaged on the map, so the system works without GPS.

What does a black vehicle on the map mean?

A vehicle under special supervision. Red marks a vehicle with navigation for a foreign driver, and white marks the others.

How many languages does driver navigation support?

Voice navigation works in one of 10 languages and relies on an editable matrix of messages at junctions.

Why does navigation stay silent at a junction?

When the approach arm is unknown, the system stays silent on purpose, because a wrong direction is worse than no message.

See the vehicle map live

We will show how the duty officer sees battery status, the delivery route and vehicle colours. Book a demo with the InnerWeb team.

Let's talk