Delivery route and stop analysis: a guide for the security officer

Delivery route analysis lets you reconstruct which way a driver travelled across the plant and where they stopped for longer than a minute. The operator isolates one active delivery on the map and sees the route from the entry to the present moment, together with the pin of the declared destination. This guide shows how to turn that into evidence in a case of leaving the route.

over 1 min
threshold for a stop marked on the delivery route
Source: karta

When to use route analysis

There are three common reasons. The first: a driver did not reach the ramp at the expected time, and the question is where they were. The second: security received a signal that a vehicle is standing in a place where it should not be. The third: after an incident on the road, the course of the delivery must be reconstructed to assess whether the driver followed the directions.

In each of these cases the route matters, not a single position. A single position tells you where the vehicle is now. The route tells you how it got there, and only that makes it possible to tell wandering apart from deliberate deviation.

How to reconstruct one delivery on the map

On the online map the operator isolates one active delivery. They then see the route from the entry to the present moment, the stops longer than one minute and the pin of the declared destination. The destination pin is the reference point: you compare it with the direction in which the route actually develops.

The delivery route follows from the BLE transmitters detected by the locator, not from GPS. This matters when interpreting it: where transmitter coverage is sparser, the route is less detailed, and with transmitters about every 100 m you should not expect centimetre accuracy.

The colour of the vehicle on the map gives context. A vehicle with navigation in a language other than Polish is red, a vehicle under special supervision is black, and an ordinary one is white. When analysing, check straight away which language the driver had for their messages and whether the delivery was marked as supervised.

Example delivery: time on route segments

Example delivery: time on route segmentsBar chart of an example delivery: gate to weighbridge 6 minutes, stop at the weighbridge 4, weighbridge to ramp 5, stop in the wrong place 3 minutes.0246minGate to weighbridge: 6 min6 minGate to weighbridgeStop at weighbridge: 4 min4 minStop at weighbridgeWeighbridge to ramp: 5 min5 minWeighbridge to rampStop in the wrong place: 3 min3 minStop in the wrongplace
Source: Illustrative example: values made up to show how to read a route, not plant data

Interpreting a stop longer than one minute

A stop longer than one minute is not a violation in itself. Typical innocent causes are a queue at the weighbridge, waiting for the gate to open, or a phone call with the dispatcher. A stop becomes significant when it lies in a place unrelated to the destination of the delivery: next to a store of dangerous materials, by a fence or at an evacuation exit.

Compare stops with the declared destination and with the navigation messages. If the system could not determine the direction of approach to a junction, it stayed silent and recorded this in the log, so the lack of a message is not the driver's fault. If a message was sent but expired after 55 seconds because the phone did not receive it, that is also information for discussion, but about coverage, not about the driver.

  • compare the place of the stop with the delivery destination
  • check whether there is a gap in transmitter coverage at that place
  • look at the navigation message log
  • ask the dispatcher about contact with the driver at that time

Recording the evidence and next steps

For an explanatory procedure, record: the time of entry, the route, the places of the stops, the declared destination and the result of the conversation with the driver. If the finding matters for safety, enter it in the system as an incident report with a location from the plant dictionary, so that the right team takes the matter over.

A report from an incident can be developed into a work permit if corrective work on the road is needed. Repeated stops in the same place are a signal to change the navigation matrix or the signage, not a reason to penalise drivers.

Video

Frequently asked questions

Does the route come from GPS?

No. The route follows from BLE transmitters detected by the locator.

How does the system know where the driver was meant to go?

The map shows the pin of the declared delivery destination, which can be compared with the actual route.

Does a stop longer than one minute mean a violation?

No. It is a marker to be explained; a violation only arises from a stop in a place unrelated to the destination.