Joining a permit by location: FAQ

Once a location is recognised, the system can add a worker to the permit at the place of work and remove them on exit, so working time follows position, not declaration. We answer questions from shift supervisors and HR departments: where the position comes from, what happens to working time and what this function does not replace.

1 per 100-200 m2
transmitter density in a building
Source: card
0
GPS readings required inside the hall
Source: card

How does the system know where a worker is in the hall?

The worker's position comes from the signals of several BLE transmitters, averaged on the map. The system does not rely on a single reading, so a momentary disturbance of one transmitter does not move the worker to another place in the hall. The solution works without GPS, which matters indoors, where satellite signal is weak or unavailable.

For buildings, a density of 1 transmitter per 100-200 m2 is assumed. For the concept of an assembly hall this means a density that can be calculated before purchase: the shift supervisor and the purchasing department can estimate the number of transmitters from the hall plan in advance. We describe an example of such a calculation in the article on the cost of covering a hall with transmitters.

How does joining a permit work?

When the worker's location matches the place where a permit is active, the system can join the worker to that permit. After leaving the place of work, the worker can be removed from the permit. The worker does not have to remember to report the start and end of work manually, and the supervisor does not have to close lists after the fact.

It is worth noting that this is an option that depends on the installation configuration. The course of a permit follows the template linked to the location, and templates are configured in the installation data, without changes to the code. The plant therefore decides for which places and work types joining by location is used.

  • Entering the area of an active permit: the worker can be joined.
  • Leaving the area: the worker can be removed from the permit.
  • The rules for a place are defined by the permit template assigned to the location.

Transmitters for a 1,000 m2 hall by density

Transmitters for a 1,000 m2 hall by densityBar chart: a 1,000 m2 hall needs 5 transmitters at a density of 1 per 200 m2, about 6.7 at 1 per 150 m2, and 10 at 1 per 100 m20246810pcs1 per 200 m2: 5 pcs5 pcs1 per 200 m21 per 150 m2: 6.7 pcs6.7 pcs1 per 150 m21 per 100 m2: 10 pcs10 pcs1 per 100 m2
Source: Sample calculation: 1,000 m2 divided by the area per transmitter

What about the worker's working time?

Working time follows the location, not the declaration. For shift supervisors this means that the attendance record at a permit comes from the worker's position, not from a list filled in by the contractor's coordinator. Differences between the declared and the actual time spent in the work zone become visible without additional checks.

For HR and for the people settling external companies, this is supporting material that complements existing systems. InnerWeb is an independent system that complements the existing ones and does not replace time recording or access control. Attendance data at a permit can be compared with data from those systems, but settlement always stays with the client's payroll system.

Does location joining affect closing the work?

Yes, indirectly. A PSZN cannot be closed while more than one worker remains on site, and removing workers after they leave the place of work provides current data for this check. Closing then does not rely on the coordinator's answer that the team has already left, but on the state the system sees on the map.

In the concept for a plant building agricultural machinery, where external firms carry out hot work, this rule brings order to the handover of the place after work. We describe this concept as an implementation scenario, not as a completed installation.

What this function does not replace

Joining by location does not replace the decision to admit work. Approval of the permit and of the PSZN stays with the plant, and the location only shows who is at the work. It also does not replace training, safety induction or the contractor's qualifications.

The function is also not a promise of legal compliance. The system supports meeting the requirement and provides audit evidence in the form of a record of who was in the work zone and when, but responsibility for organising the work stays with the plant and the contractor.

Video

Frequently asked questions

Is GPS needed for joining by location?

No. The position comes from the signals of several BLE transmitters averaged on the map and works without GPS, also inside buildings.

Who decides where the function works?

The plant, through permit templates linked to locations. Templates are configured in the installation data, without changes to the code.

Does location recording replace time recording?

No. InnerWeb complements existing systems, so attendance at a permit can be compared with time recording data, but settlement stays in the client's system.

How do you know how many workers are left on site?

From the locations joined to the permit. Closing a PSZN is blocked while more than one worker remains on site.