Working Time on a Permit: How to Settle a Crew After the 04:00 Cutoff

A crew working on a permit through the whole night loses its working status at 04:00 and has to rejoin. This is not an error, but a daily cutoff of working time that separates the days. Below we explain how the contractor coordinator should settle it and what to record in the documentation.

04:00
daily cutoff of working time
Source: permit working time feature sheet
710 min
total time in the example of a crew working from 18:00 to 06:00
Source: illustrative example from the section What happens at 04:00

Where working time starts and where it ends

The working time of a person on a permit is counted from joining, or from starting with location, until one of four events: the person ends their work, the permit is closed, the permit term expires, or the daily cutoff at 04:00 takes place. The event that comes first ends the segment.

Starting with location means that the time can begin based on the person's presence in the work area, without manual clicking. This is convenient for crews who enter the hall in groups at different times, but it requires the location in the work area to be configured. In a building, roughly one transmitter per 100 to 200 m2 is assumed, and the position is averaged from the signals of several transmitters.

What happens at 04:00

The daily cutoff at 04:00 closes the time segment for everyone on the permit. After it, the worker lists are restored as invited, meaning people remain assigned to the permit but are not counted as working until they rejoin.

The purpose is simple: working time must not be counted for a person who left the plant at 22:00 and nobody recorded it. The cutoff closes this gap once a day, at the cost of the night crew having to perform one extra action at 04:00.

Example: a service crew working from 18:00 to 06:00

Six people join the permit at 18:00 and work without a break. At 04:00 the system closes the segment: the first lasts 10 hours, or 600 minutes. The crew rejoins at 04:10 and works until 06:00, which gives a second segment of 110 minutes. The total is 710 minutes, and the 10 minutes between the segments are not counted. The example is an illustration, not a measurement.

Crew time segments in the night example

Crew time segments in the night exampleHorizontal bar chart: the first segment is 600 minutes and the second segment is 110 minutes in the night crew example.0200400600minSegment 1 (18:00-04:00)Segment 1 (18:00-04:00): 600 min600Segment 2 (04:10-06:00)Segment 2 (04:10-06:00): 110 min110
Source: Illustrative example based on assumptions: joining at 18:00, cutoff at 04:00, rejoining at 04:10, end at 06:00

How the coordinator should settle it

A contractor coordinator who settles hours with an external company should adopt one rule: working time is the sum of the segments recorded in the system, not the difference between the time of entering and leaving the hall. The difference also includes breaks and transitions, which the system does not count as work.

The contract with the contractor should state that the basis for settlement is the segments from the permit, and that after 04:00 the crew rejoins without additional formalities. This wording prevents a dispute in which the contractor claims hours for the whole night while the system shows two segments with a gap.

  • Basis of settlement: the sum of the segments from the permit.
  • Rejoining after 04:00: a duty of the crew foreman, recorded in the instructions for the contractor.
  • Break between segments: not counted as working time.
  • Verification after the night: the coordinator compares the list with the shift staffing.

Permit with preparation tasks and working time

Working time starts to count on the permit, not at the moment of entering the site. A permit without preparation tasks goes straight to the main work after approval, while one with preparation tasks first goes to the in-preparation status. In practice, this means hours from the preparation phase should not be settled as hours of the main work.

A coordinator who wants to separate the costs of preparation and of work can do so by distinguishing the first segment after approval from the segment after the main work starts. The details are agreed with the contractor at the start of cooperation.

Evidence for an audit

The system provides audit evidence of who worked, in which segments and on which permit. The evidence is especially useful in a dispute over a contractor's overtime and in a check of whether a person was on site without a valid permit.

InnerWeb is a software producer and complements the plant's existing systems, such as time and attendance or access control, rather than replacing them. Card swipes from the access control system can be received and linked with permits, but the settlement of an external company's working hours is based on the segments recorded on the permit.

Video

Frequently asked questions

Does the 04:00 cutoff remove people from the permit?

No. The worker lists are restored as invited, so people remain assigned to the permit, but they must rejoin for their working time to count again.

Can time start counting without clicking?

Yes, time can start from starting with location, provided the location in the work area is configured.

Does working time end when the permit is closed?

Yes. Closing the permit is one of four events that end a segment, alongside the end of work by the person, the expiry of the term and the 04:00 cutoff.